Laserfiche WebLink
CITY OF SAN LEANDRO <br /> SAN LEANDRO SHORELINE DEVELOPMENT PROJECT EIR <br /> EXHIBIT A: WORK SCOPE AND COSTS <br /> 11. TECHNICAL REPORT <br /> KAI will document the transportation analysis from tasks 1 through 10 in a stand-alone <br /> technical report. , <br /> 12. INPUTS FOR AIR AND NOISE ANALYSES <br /> KAI will provide traffic output data for the Air and Noise analyses,including: <br /> ♦ Daily Volumes for all roadways segments that are counted for all scenarios(preferably <br /> in an excel file) <br /> • Existing with and without project <br /> • Buildout with and without project <br /> ♦ Fleet mix on the segments for existing and future timeframes,if available <br /> ♦ Speed limits on the segments for existing and future timeframes,if available <br /> ♦ Weekday and Weekend(if available)Trip Generation for land uses for all scenarios <br /> • Existing trip generation <br /> • Buildout(trip generation by land use type and indicate assumptions for reductions <br /> for passby/diverted/internal trip capture) <br /> 13. ADMINISTRATIVE DRAFT EIRs <br /> KAI will assist The Planning Center I DC&E with development of the Traffic section and <br /> respond to two rounds of comments on the ADEIR. <br /> 14. DRAFT EIR <br /> KAI will assist The Planning Center I DC&E with development of the Traffic section and <br /> respond to one round of public comments on the Draft EIR. <br /> 15. MEETINGS <br /> KAI will attend up to six meetings with the City of San Leandro staff, Caltrans staff,or other <br /> relevant agencies staff, and two public hearings as part of this scope of work. Some of the <br /> project meetings will occur via conference call. City Planning commission, City Council and <br /> Public Hearings will be at the City. <br /> THE PLANNING CENTER I DC&E 10 <br /> MAY 1,2013 <br />