My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2013 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0715
>
8D Consent 2013 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 3:14:51 PM
Creation date
7/10/2013 5:14:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/15/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0715 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0715
Reso 2013-105
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Scope of Services – Tidemark upgrade San Leandro, CA <br /> <br /> <br /> <br /> <br /> <br /> Page 8 <br /> <br />City Responsibilities: <br />• Identify and make available staff members who will work with the TruePoint Team through this process and <br />take responsibility for providing information for and validating the Record types to be configured. <br />• Arrange the time for qualified decision makers and business experts for the design review/configuration <br />analysis sessions that are critical to project success. <br />• Unit testing and final system testing of the configuration. <br /> <br />The City will test the configured system for purposes of validating the Record types configured. The records will be <br />accepted when the TruePoint Team and the City agree that all requirements, objectives, and scope have been <br />appropriately defined in each Record type per the configuration document. Acceptance will also be based on the <br />City’s assessment that the transfer of knowledge on configuration functionality and techniques was adequate for City <br />IT staff to perform configuration activities on their own. <br /> <br /> <br />BUILD <br />The Build stage includes development of a Parcel and Owner interface from outside sources, Tidemark conversion, <br />development of Event Scripts to automate business processes and the installation and configuration of Accela add-on <br />products. <br /> <br />ADDRESS, PARCEL AND OWNER INTERFACE <br />The TruePoint Team will the deliver and provide instructions on a interface to populate Address, Parcel and Owner <br />(APO) information. This project task is expected to not exceed 8 hours from the APO Interface cost category. <br />• The City will create a flat file in the standard Accela format for APO data that is compatible with the Accela <br />standard staging tables, which TruePoint will use to update the Accela reference data. This process can be <br />set up to run occasionally after the implementation in corporation with the Accela Customer Resource Center. <br />• In addition to the standard data fields the City may choose to add additional parcel attributes to the parcel <br />data in the Land management system. These will be defined as part of the business analysis process. <br /> <br />City Responsibilities: <br />• Allocate the time for qualified business and technical experts for the interface requirements sessions that are <br />critical to the project success. <br />• Provide data in the format specified by Accela. <br />• Assist in the interface/data mapping process. <br />• Ensure that the data populates successfully according to the interface requirements document. <br />• Allocate the time for qualified personnel to test the interface for acceptance <br /> <br />The APO interface will be accepted when the City agrees that all data is being created or updated successfully. <br /> <br /> <br /> <br />TIDEMARK CONVERSION <br />The conversion of historic data from the existing database is one of the most significant aspects of a project when <br />migrating from one system to another. The required data mapping effort will be conducted by the TruePoint Team <br />working directly with City personnel. Once the data mapping has been defined, The TruePoint Team will ask that a <br />representative of the City sign off on the data maps. The TruePoint Team will load the data based upon the data <br />maps specification provided by the City using the standard Tidemark to Accela Automation tool. The TruePoint Team <br />will be responsible for the data conversion programs to load data to the Accela Automation database in the Support
The URL can be used to link to this page
Your browser does not support the video tag.