My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2013 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0715
>
8H Consent 2013 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 3:16:57 PM
Creation date
7/10/2013 5:16:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/15/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0715 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0715
Reso 2013-110
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: July 15, 2013 <br />Staff Report <br />Agenda Section:File Number:13-318 CONSENT CALENDAR <br />Agenda Number:8.H. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Awarding a Construction Contract to Fanfa , Inc. <br />for the Stenzel Park Drainage Project, Project No. 2003.0720 <br />SUMMARY AND RECOMMENDATIONS <br />The subject project will install a drainage system in a portion of Stenzel Park. Staff <br />recommends the City Council award the contract to the lowest responsible bidder, Fanfa Inc., <br />in the amount of $123,000.00 for the subject project. <br />BACKGROUND <br />On March 2, 2009, the City received notice from the East Bay Regional Parks District <br />(EBRPD) of its eligibility for $3,740,998 in Measure WW Park Bond funds. The funds are for <br />the development of neighborhood, community and regional parks and recreation lands and <br />facilities. After completing a community process, the City developed a ranked list of City park <br />improvement projects for the City Council to consider funding with these funds. In the <br />2010-2011 fiscal year budget, nine projects, including the Stenzel Park Drainage Project, were <br />approved as part of the Capital Improvement Program. <br />City Staff noted that rainwater ponded at the northwest portion of the ball field at Stenzel Park . <br />This is an ongoing issue that recurs each winter, affecting the usability of the field and <br />creating maintenance problems. <br />This project will remove sections of turf and the upper layer of soil in the ponding area. An <br />underground drainage system will be installed to increase the field’s tolerance for water . The <br />surface will be repaired with new top soil and sod. <br />Analysis <br />The bids were opened on June 27, 2013. Six (6) bids were received ranging from <br />$123,000.00 to $201,589.00. Fanfa Inc. was determined by staff to be the apparent lowest <br />Page 1 City of San Leandro Printed on 7/9/2013
The URL can be used to link to this page
Your browser does not support the video tag.