My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2013 0715
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0715
>
8H Consent 2013 0715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 3:16:57 PM
Creation date
7/10/2013 5:16:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/15/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0715 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0715
Reso 2013-110
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-318 <br />responsible bidder. The engineer's estimate for the work was $119,410.25. Staff verified that <br />the contractor has a valid license with the Contractors State License Board. <br />Previous Actions <br />·On February 17, 2009, by Resolution No. 2009-023, the City Council approved a <br />resolution authorizing the application for local grant funds from EBRPD under Measure <br />WW, the Park Bond Extension <br />·On June 3, 2013, by Resolution No. 2013-075, the City Council approved a resolution <br />approving Plans and Specifications and Calling for Bids <br />Applicable General Plan Policies <br />This project is consistent with General Plan Goal No. 21 - Rehabilitation of existing parks. <br />Environmental Review <br />The project was determined Categorically Exempt under the California Environmental Quality <br />Act (CEQA) pursuant to Section 15061(b)(3). A notice to this effect was filed with the County <br />on March 26, 2010. <br />Fiscal Impacts <br />The estimated total cost of the Stenzel Park Drainage project is $178,930.00. The design <br />phase cost was $23,110.00, and the construction phase is estimated at $155,820.00. <br />Budget Authority <br />The improvements will be funded using Measure WW bond funding in existing account <br />150-62-114, approved as part of the 2010-2011 CIP Budget. <br />ATTACHMENTS <br />·Bid Summary <br />PREPARED BY: Nelson Lam, P.E., Assistant Engineer, Engineering and Transportation <br />Department <br />Page 2 City of San Leandro Printed on 7/9/2013
The URL can be used to link to this page
Your browser does not support the video tag.