Laserfiche WebLink
15. PROFESSIONAL SEAL. Where applicable in the determination of the contract administrator, <br /> the first page of a technical report, first page of design specifications, and each page of <br /> construction drawings shall be stamped/sealed and signed by the licensed professional <br /> responsible for the report/design preparation. The stamp/seal shall be in a block entitled"Seal <br /> and Signature of Registered Professional with report/design responsibility"as per sample below. <br /> Seal and Signature of Registered Professional <br /> with report/design responsibility <br /> Contractual Services Agreement Page 15 of 15 <br /> CHS Consulting Group <br />