My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 CHS Consulting Group
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 CHS Consulting Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2013 10:02:52 AM
Creation date
8/23/2013 10:01:04 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/15/2002
Retention
PERM
Document Relationships
Reso 2002-102
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF SERVICES <br /> General: <br /> The project consists of replacing/converting the High Voltage Street Lighting System (6000 V) in three <br /> different neighborhoods. Your firm will provide design and coordination services for the <br /> replacement/conversion of the existing High Voltage Street Lighting System (6000 Volts) to prepare plans <br /> and specifications including a combination of trenching and boring, installation of new conduits, splice <br /> boxes, wiring, service and lighting fixtures to match or replace the existing system. The intent of the <br /> project is to replace the existing high voltage system with a standard 120/240 volt system and abandon the <br /> existing system in place on the following streets: <br /> • Joaquin Avenue between East 14th Street and San Jose Street <br /> • Lee Avenue between Dutton Avenue and Arbor Drive <br /> • Arbor Drive between Dutton Avenue and Lee Avenue <br /> • Warwick Avenue between Dutton Avenue and Durant Avenue <br /> • Beverly Avenue between Dutton Avenue and Durant Avenue <br /> • Dowling Avenue between Kenilworth Avenue and Breed Avenue <br /> • Victoria Avenue between Warwick Avenue and MacArthur Boulevard <br /> • Kenilworth Avenue between Durant Avenue and Dutton Avenue <br /> The City encourages both an open minded and value engineering approach toward replacement or <br /> conversion or a combination of both. <br /> Task 1 Preliminary Design and Construction Cost Estimate: <br /> Initially, CHS Consulting Group (CHS) will perform a detailed field review of the project site to inventory <br /> (by types) and locate the existing, above ground electroliers, pull boxes and other pertinent items such as <br /> driveways and utility poles. Also,gather relevant information from identifiable utility agencies. <br /> CHS will then schedule a date and time to meet with City staff to discuss the scope of the project in detail. <br /> Prior to the meeting, CHS may need to submit a list of additional questions for the City's response, which <br /> will ultimately aid in developing a Value Engineering Report. <br /> Specific tasks to be performed during this phase will include: <br /> • Meeting with the City team and site investigation <br /> • Perform a Value Engineering Report as related to replacement or conversion of existing system <br /> • Incorporate all topographic information into a base map and issue to utility agencies <br /> • Coordinate with PG&E regarding new service points <br /> • Lighting level study of the existing and proposed street light system <br /> • Prepare required plans (AutoCad R14); specifications and engineer's construction cost estimate to <br /> conform with the City's standard format and in accordance with the Standard Specifications for <br /> Public Works Construction(Green Book) <br /> Contractual Services Agreement Page 3 of 15 <br /> CHS Consulting Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.