Laserfiche WebLink
15. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br /> administrator, the first page of a technical report, first page of design specifications, and each <br /> page of construction drawings shall be stamped/sealed and signed by the licensed professional <br /> responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br /> and Signature of Registered Professional with report/design responsibility" as per sample below. <br /> Seal and Signature of Registered Professional with <br /> report/design responsibility <br /> Exhibit D Page 7 of 7 <br /> 6/12/95 rev. <br /> 5/20/97 rev. J:\WPD\Forms\Agre\ExhibitD.W61 <br />