My WebLink
|
Help
|
About
|
Sign Out
Home
8B Consent 2013 0903
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0903
>
8B Consent 2013 0903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2013 3:55:22 PM
Creation date
8/28/2013 10:44:17 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/3/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0903 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0903
MO 2013-041
(Reference)
Path:
\City Clerk\City Council\Minute Orders\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Helene Fried Associates in cooperation with Community Design + Architecture <br />Final Artistic Enhancement Strategy [July 2013 Update] ± Integrating Artistic Enhancements with BRT Station Design <br />July 11, 2013 <br />Page 15 of 19 <br /> <br />Simultaneous Outreach to Art Community and Broad and Diverse Public <br />The community outreach effort will extend to the professional artist community (see Artist Resource <br />section), and the broader local and national public. Informational open houses may take place to provide a <br />forum in which the selected artists can present their art enhancement themes and initial concepts. These <br />open houses are a continuation of the public process that has taken place over the life of the project. <br />A thoughtful outreach to both the art community and the broader public may include: <br /> ƒ Engage the expertise and resources of a community outreach and media relations/community <br />outreach specialist to create a detailed plan with the public art consultant. <br /> ƒ Create a dedicated email address and telephone contact list to provide information and respond to <br />questions for community outreach efforts, in addition to standard AC Transit sources. <br /> ƒ Broadly recruit and distribute information to community service providers including social, ethnic, <br />faith-based, and other and organizations. <br /> ƒ Issue press release and press announcement to inform media sources of art enhancement program and <br />ability for public to review and comment. <br /> ƒ Include one or more community representatives on the Artist Selection Panel for AC Transit <br />appointment. Public art consultant to brief lay members serving on the Artist Selection Panel in <br />advance of their meeting. <br /> ƒ Invite the public to meet the Artist(s) and/or Team(s) for each of the up to three station groupings to <br />GLVFXVVWKHDUWLVW¶VSUHOLPLQDU\GHVLJQFRQFHSWWKHLULQWHUSUHWDWLRQRIWKHWKHPHDQGWRDOORZWKH <br />communities to provide feedback to the artist(s) about their history, values, and ideas. Provide public <br />comment cards. <br />Whether or not the envisioned community outreach activities are eligible for funding out of the $1.5 M <br />identified for artistic enhancements of station design elements still needs to be determined, and is largely <br />dependent on pending interpretation of the new MAP 21 funding guidelines. <br />Proposed Timeline <br />In order to meet the strict project timeline for design, engineering, and construction, the artistic <br />enhancement will have to be closely integrated with the BRT design team¶V work on the 65% and 95% <br />design efforts. <br />To successfully implement the recommendations described in this Strategy will require meeting a series <br />RIPLOHVWRQHVQHFHVVDU\IRU$&7UDQVLW¶VUHYLHZDSSURYDODQGSROLF\DFWLRQV6HYHUDORIWKHVHRFFXUUHG <br />prior to or in early 2013, after the cities of Oakland and San Leandro and other third parties (stakeholders) <br />provided their input on the draft Strategy. The Draft Artistic Enhancement Strategy was reviewed by the <br />San Leandro City Council in December 2012 and the Oakland Public Art Advisory Committee (PAAC) <br />in January 2013. Others steps still need to occur, such as AC Transit establishing a broad conceptual <br />theme for the overall artistic initiative that will be refined as the artists meet with the community. This <br />includes the identification of one or several themes that the artists may be presented with during the artist <br />VHOHFWLRQSURFHVVLH³IRFXVDUWLVWLFHQKDQFHPHQWVRQH[SUHVVLQJFRPPXQLW\KLstory along the <br />FRUULGRU´.H\PLOHVWRQHVLQWKHabbreviated timeline below also include: final endorsement of this <br />Strategy, briefings of City of Oakland and San Leandro staff about the art enhancement program prior to <br />the release of artist solicitations, issuing the artist selection RFQs, formation of the Artist Selection Panel <br />DQG7HFKQLFDO$VVLVWDQFH&RPPLWWHH7$&DZDUGRIWKHDUWLVWFRPPLVVLRQVDFFHSWLQJWKH3DQHO¶V
The URL can be used to link to this page
Your browser does not support the video tag.