My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2013 0916
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0916
>
8F Consent 2013 0916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2013 2:11:49 PM
Creation date
9/11/2013 4:33:22 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/16/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0916 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0916
Reso 2013-118
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-398 <br />and specifications and called for bids on the subject project <br />·On March 13, 2013, by Resolution No. 2013-039, the City Council awarded a construction <br />contract to Grade Tec, Inc. for the subject project <br />Applicable General Plan Policies <br />This project is consistent with General Plan Goal No. 21 - Rehabilitation of existing parks <br />policy. <br />Environmental Review <br />This project was determined to be Categorically Exempt in accordance with CEQA Section <br />15301 (Existing Facilities) Part (s) for existing bicycle and pedestrian trails. <br />A Notice of Exemption was filed with Alameda County on March 20, 2009. <br />Fiscal Impacts <br />·The total cost of the Toyon Park Pathway Rehabilitation project was $90,000. A summary <br />of the site work construction contract with Grade Tec , Inc. is listed below: <br />Grade Tec, Inc.: Original Contract: $47,650 <br />Change Orders: $22,000 <br />Total Contract Amount: $69,650 <br />Major change order work involved lime treatment of the subgrade to stabilize areas that could <br />not support paving equipment. <br />Budget Authority <br />Measure WW funds for asphalt rehabilitation at City Parks was originally appropriated in CIP <br />Account No. 150-62-108 and approved by City Council as part of the 2010-2011 City budget. <br />To allow for coordination with other projects at Toyon Park , a portion of those funds were <br />separated into Account No . 150-62-115 specifically for paving work at this park. This paving <br />project is the last park to be rehabilitated under the original project appropriation. <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Department <br />Page 2 City of San Leandro Printed on 9/11/2013