My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2013 1007
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 1007
>
8E Consent 2013 1007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2013 9:42:26 AM
Creation date
10/2/2013 2:40:56 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/7/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 1007 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1007
Reso 2013-131
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-460 <br />2.At the BART Station <br />a.Electronic bicycle lockers <br />b.Bicycle racks <br />c.Bicycle shelter <br />3.East of the BART Station <br />a.Sidewalk bulb-outs and enhanced crosswalk treatments along West Juana <br />Avenue at the intersections of Carpentier , Clarke and Hays Streets <br />b.West Juana Avenue narrowed by four feet and southern sidewalk widened <br />between San Leandro Boulevard and Carpentier Street <br />The San Leandro BART area developers were to provide engineering , project management, <br />construction and matching funds for the SR2 T project; however, the developers’ projects have <br />been delayed, which has hindered the SR2 T project’s completion . To move the SR2T project <br />forward, a revised project to be completed entirely by the City was proposed to the MTC for <br />approval. <br />The revised SR2T includes the following improvements : <br />1.At the BART Station <br />a.Electronic bicycle lockers <br />b.Bicycle racks <br />c.Bicycle shelter <br />2.East of the BART Station <br />a.Sidewalk bulb-outs and enhanced crosswalk treatments along West Juana <br />Avenue at the intersections of Carpentier , Clarke and Hays Streets <br />b.West Juana Avenue narrowed by four feet and southern sidewalk widened <br />between San Leandro Boulevard and Carpentier Street <br />The revised SR2T eliminates the following improvements : <br />1.West of the BART Station <br />a.Relocated West Estudillo Avenue pedestrian railroad crossing for alignment with <br />BART fare gates <br />b.Public Bike/Pedestrian Paseo from relocated pedestrian railroad crossing to <br />Alvarado Street <br />c.New bike/pedestrian pathway within the BART parking lot from the relocated <br />pedestrian railroad crossing to the BART fare gates <br />The MTC approved these proposed modifications to the SR2 T project to allow the project to <br />proceed. <br />Recently, the City was awarded Measure B Bicycle-Pedestrian Discretionary grant funds to <br />partially fund the proposed pedestrian improvements along West Juana Avenue . The <br />combination of SR2T and the Measure B Discretionary grant funds will allow the City to <br />complete the West Juana pedestrian improvements , along with the bicycle lockers, racks and <br />a shelter independent of private developer support. <br />Analysis <br />Page 2 City of San Leandro Printed on 10/2/2013
The URL can be used to link to this page
Your browser does not support the video tag.