Laserfiche WebLink
<br />Facility Audit Report 15 <br />San Leandro WWTF <br /> <br />Table 3.2.1.2.1 Capital Cost Summary for the Aeration Blower Retrofit Measure <br /> <br />Table 3.2.1.2.2 summarizes the overall project costs, savings, and simple payback. This project <br />would easily qualify for full funding with a California Energy Commission (CEC) loan. CEC <br />loans have payment terms that allow the energy cost savings to pay off the loan. PG&E is now <br />offering a loan package that also allows the energy savings to pay for the capital cost. <br />Table 3.2.1.2.2 – Economic Summary of Blower Automation and DO Control Measure <br /> <br />DescriptionAmount <br />Project Cost$195,000 <br />Total Annual Savings$29,600 <br />Simple Payback (years)6.6 <br />Energy Savings Rebate Estimate @$0.09/KWHr$24,800 <br />Demand Savings Rebate @ $100/KW Peak Summer Month$1,000 <br />Net Project Cost after Rebate$169,200 <br />Simple Payback (years) after Rebate5.7