My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2013 1007
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 1007
>
8F Consent 2013 1007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2013 9:41:17 AM
Creation date
10/2/2013 2:41:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/7/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 1007 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1007
Reso 2013-126
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Facility Audit Report 16 <br />San Leandro WWTF <br />4. SAVINGS AND VERIFICATION PLAN <br />4.1 Energy Efficiency Projects <br />Project Level <br />When the program screening process results in an energy savings estimates at the <br />project level, QuEST will use the following guidelines for determining the level of <br />investigative thoroughness: <br />Option B: Verification for sites with anticipated savings between 200,000– <br />800,000 kWh <br />QuEST will provide two weeks of metered data for both pre- and post conditions for the <br />energy efficiency measures that are estimated to be contributing the greatest savings at <br />a site where the estimated savings are between 200,000 and 800,000 kWh. QuEST will <br />provide documentation to support the pre- and post implementation conditions. <br /> <br /> Measure Level <br />When the program screening process results in energy savings estimates at the <br />measure level QuEST will use the following guidelines: <br /> <br />Option B: For measures identified with a savings potential of 75,000 kWh <br />and above <br />QuEST will provide two weeks of metered data for both pre- and post conditions and will <br />provide documentation to support the pre- and post implementation conditions. <br /> <br />4.2 Retrofit Projects <br />QuEST will conduct a visual verification of the installation of all retrofit projects and will <br />provide PG&E with digital pictures and invoices for all equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.