Laserfiche WebLink
• <br /> C. in the event that the use of the tower to operate a turbine is abandoned, the applicant <br /> shall obtain the necessary building permit to remove the tower and restore the site to <br /> its pre-installation condition. <br /> V. CONSTRUCTION PROVISIONS <br /> A. Construction activity on private property shall not commence prior to 7:00 a.m. <br /> and shall cease by 7:00 p.m. Monday through Friday, and construction activity <br /> shall not commence prior to 8:00 a.m. and shall cease by 7:00 p.m. on Sunday and <br /> Saturday. No such construction is permitted on Federal holidays. As provided in <br /> the City of San Leandro's Noise Ordinance (ORDINANCE NO. 2003 — 005), <br /> "construction" shall mean any site preparation, assembly, erection, substantial <br /> repair, alteration, demolition or similar action, for or on any private property, <br /> public or private right-of-way, streets, structures, utilities, facilities, or other <br /> similar property. Construction activities carried on in violation of this Article may <br /> be enforced as provided in Section 4-11-1130, and may also be enforced by <br /> issuance of a stop work order and/or revocation of any or all permits issued for <br /> such construction activity. <br /> B. Construction activity shall not create dust, noise, or safety hazards for adjacent <br /> businesses and properties. Dirt and mud shall not be tracked onto Grant Avenue <br /> from the project site during construction. <br /> C. Standard construction dust control procedures, such as wetting, daily road <br /> washing, and other maintenance functions to control emissions, shall be <br /> implemented at all times during outdoor construction. Dust generating activities <br /> such as grading, excavation, paving etc., shall be scheduled in the early morning <br /> or other hours when wind speeds are low. All construction activities entailing soil <br /> disturbance shall cease when winds exceed thirty (30) miles per hour as an hourly <br /> average. <br /> D. The applicant shall prepare a construction truck route plan that would restrict <br /> trucks to arterial streets that have sufficient pavement section to bear the heavy <br /> truck traffic, thereby minimizing noise and traffic impacts to the community. The <br /> construction truck route plan shall be reviewed and approved by the City Engineer <br /> prior to issuance of the building permit. <br /> E. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall be <br /> no truck hauling activity on Saturdays, Sundays, and legal holidays. <br /> F. Procedures with the highest noise potential shall be scheduled for daylight hours, <br /> when ambient noise levels are highest. <br /> G. The applicant and/or contractor(s) shall be required to employ the quietest among <br /> alternative equipment or to muffle/control noise from available equipment. <br /> II. All construction contracts shall include the following requirements: 1) Unpaved <br /> construction sites shall be sprinkled with water at least twice per day; and 2) <br /> Agreement to Conditions April 1, 2013 <br /> PLN2012-00006 Pace 6 of 7 <br />