My WebLink
|
Help
|
About
|
Sign Out
Home
10C Action 2013 1216
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 1216
>
10C Action 2013 1216
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 11:02:21 AM
Creation date
12/11/2013 5:31:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/16/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 1216 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 1216
Reso 2013-159
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
29 City of San Leandro | Economic Development Initiatives and Work Plan | December 2013 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Accomplishments To-Date: In October 2012, the requested grant was awarded. The grant is a <br />matching grant, with the EDA contributing up to 50% of the cost of the project. The entire <br />project cost is estimated to total $4.3 (rounded). The City’s contribution includes the value of <br />the land (street rights of way), architectural and engineering services and some absorption of <br />cash expenses. <br /> Appraisal was completed in April 2013. <br /> Site survey contract approved by City Council on May 20th. <br />Construction is anticipated to begin in early 2014. <br /> <br />Regional Expansion – It is Dr. Patrick Kennedy’s intention to expand Dark Fiber LLC <br />throughout the Bay Area Region. While staff is not directly involved with those discussions, we <br />recognize that the San Leandro and the East Bay has a brief window in time before high speed <br />internet is universally available. Accordingly, San Leandro is in a unique leadership position to <br />demonstrate how to use high-speed internet access to drive economic, social and cultural <br />growth. As other cities are added to the SL Dark Fiber network, it will be important for us to
The URL can be used to link to this page
Your browser does not support the video tag.