|
SAN LEANDRO ADMINISTRATIVE CODE TITLE 6 FINANCE
<br /> (2)Direct Costs/Planning:Hourly personnel charge plus a factor of 33°o for benefits, 83°o for indirect overhead charges and
<br /> 89°o for staff support charges.
<br /> (3)Based on case-by-case financial analysis and appraisals(?fsubject facilities/im rorements.
<br /> COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING REGULATIONS DIVISION
<br /> 1.Plans and Specifications See Engineering&Transportation Dept.Item 7,Public Work Projects
<br /> 2. Building Permit
<br /> NOTE:FEES FOR BUILDING PERMITS ANT)TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION
<br /> (EARTHQUAKE)INSTRUMENTATION PROGRAM(S.M.I.P.)FEE MANDATED BY THE STATE OF CALIFORNIA ANT)
<br /> COLLECTED BY THE CITY FOR THE STATE. THIS FEE MUST BE ADDED TO THE PERMIT FEES.
<br /> A.Filing and Issuance Fee $92 plus valuation fees and or other building fees as listed below
<br /> Re-filing Fee for each resubmittal,deferred
<br /> submittal,and or revision after the 1st resubmittal,or
<br /> upon the 2nd resubmittal for plan check on the same
<br /> project 500 o of Filing and Issuance Fee per occurrence
<br /> Minimum fee for one inspection Included in the Issue and Filing Fee
<br /> Building permits requiring more than one inspection,
<br /> other than for those requiring return inspections for
<br /> corrections from a previous inspection,have a
<br /> minimum fee of $140.00
<br /> All-Inclusive Permit:Work involving a combination
<br /> of building and or mechanical,electrical and One Filing and Issuance Fee plus items from respective
<br /> plumbing,with a value of less than$3,000: fee tables
<br /> Residential Seismic Retrofit projects using"Plan set $75.00 plus Filing and Issuance Fee and other
<br /> A"(for one and two family residences) miscellaneous fees
<br /> Permits involving plan check,inspections.and 1250 o of normal Building Permit Fee.Plan check fee
<br /> verification per OSHPD3 requirements shall be calculated based on this increased fee.
<br /> New commercial.!industrial buildings 10.000 sq.ft.
<br /> or more(additional time for plan review,inspections,
<br /> and verification of code requirements) 1250 o of standard Building Permit Fee
<br /> Tier 1 Certification(additional time for plan review,
<br /> inspections,and verification of code requirements) 1300 o of standard Building Permit Fee
<br /> Tier 2 Certification(additional time for plan review,
<br /> inspections,and verification of code requirements) 1350 o of standard Building Permit Fee
<br /> (Note: The Building Official may adjust the plan checking'permit fee for an individual project when costs to the City_ are not
<br /> congruent with this fee schedule.)
<br /> Total Valuation: (Based on total value of all construction work,as determined by the Building Official,including all finish work,
<br /> roofing,electrical,plumbing,heating,air conditioning,elevators,fire-extinguishing systems and any other permanent equipment.)
<br /> From-To and Including
<br /> $1.00-$4,000.00 $140.00
<br /> $4.001.00-$50.000.00 $140.00 for the first$4.000.00 plus$13.90 for each additional$1000.00 or
<br /> fraction thereof,to and including$50,000.00
<br /> $50.001.00-$100.000.00 $779.00 for the first$50,000.00 plus$9.75 for each additional$1000.00 or
<br /> fraction thereof,to and including$100,000.00
<br /> $100.001.00-$500.000.00 $1266.00 for the first$100.00000 plus$5.55 for each additional
<br /> $1,000.00 or fraction thereof,to and including$500,000.00
<br /> $500.001.00-$1000.000.00 $3.486.00 for the first$500.000.00 plus$5.25 for each additional
<br /> $1,000.00 or fraction thereof,to and including$1,000,000.00
<br /> $1000.001.00 and up $6.106.00 for the first$1,000.000.00 plus$4.40 for each additional
<br /> $1,000.00 or fraction thereof,to and including$1,000,000.00
<br /> B. Termite Repair Work $90.00 plus total valuation as listed above
<br /> $0.00-$3,000.00 $140.00
<br /> Over$3,000.00 Same as for other building permits,minimum of$140.00
<br /> C. Satellite Dish Antenna $137.00
<br /> I).Minor Kitchen Remodel Permit: a. Single kitchen or bath remodel(permit to include electrical,plumbing,
<br /> mechanical ventilation and appliances): $355.00
<br /> (Limited to work without framing changes) b.Additional bath remodel when concurrent with kitchen or bath remodel
<br /> Department Responsible for Revision:Finance Chapter 6.4
<br /> 05/06/2013 Page 3
<br />
|