Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE TITLE 6 FINANCE <br /> within the same structure and at same time: $147.00 <br /> E.Plan Checkina <br /> Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building <br /> permit fee and shall be as follows: <br /> (1)Residential fire sprinklers for 1 and 2 family <br /> dwelling new construction:Effective January 1,2011, <br /> fire sprinkler systems became mandatory in 1 and 2 <br /> family dwellings. The Division of Building and Safety_ $480.00 flat fee to include plan review and inspection of residential fire <br /> will be reviewing and inspecting the installation of sprinkler systems when installed in conjunction with new 1 and 2 family_ <br /> these systems. dwelling construction. <br /> (2)In-house-during regular working hours 801 o of the building permit fee <br /> For Master Plans(i.e.,identical buildings built by the A full plan checking fee shall be paid for each Master Plan when more than <br /> same builder on the same lot or in the same tract and for one building will be built and one half(500 o)of the full plan checking fee <br /> which building permits are issued at the same time): shall be paid for each building at time of application. <br /> Changes,revisions,or additions to plans previously_ <br /> checked Direct Cost(1)- 1 hour minimum charge <br /> Outside plan checking services as utilized at discretion <br /> of Building Official Same as for in-house-during regular working hours <br /> Additional Plan Review after the first recheck Direct Cost(1)- 1 hour minimum per occurrence <br /> (3)In-house-outside of normal business hours when Same as for in-house-during regular working hours PLUS overtime and <br /> requested by applicant overhead charges <br /> (4)By outside consultant,when requested by applicant Equal to in-house-during regular working hours PLUS consultant's fee as <br /> established by agreement(contract)between City and consultant <br /> (5)Over the counter for small changes,revisions or <br /> additions,when requested by applicant Direct Cost(1).with minimum of one-half hour <br /> (6)Expedited Plan Check when requested by applicant <br /> and when plan reviewer is available Full plan check fee plus one and one-half times Direct Cost(1) <br /> (7)Phased Plan Check-when the foundation or another <br /> part of the building needs approval and permit issuance One and one-half(1-1.'2)times the full plan check fee for the entire <br /> prior to the whole building building <br /> (8)Alternate methods and materials Direct cost(1) 1 hour minimum charge <br /> (9)Energv conservation: for all buildings subject to the <br /> California Energy_ Commission's conservation <br /> regulations 200 o of Building Permits <br /> (10)California Health&Safety Code§18949.29 fee 50 o of Building Permit Fee-For training and continuing education required <br /> applied to all projects requiring a Building Permit by the California Health and Safety Code§18949 <br /> 3. Electrical Permit <br /> A.Filing and Issuance $92 plus amount shown below for each electrical item <br /> B.Plan-Check,when applicable Direct Cost(1) <br /> For new residential construction and additions with <br /> valuations over$100,000.00 including all circuits, <br /> service and sub panels 130 o of building permit fees <br /> Circuits:Installation.replacement or alteration of each electrical circuit(includes related outlets,switches,receptacle and lighting <br /> fixtures): <br /> 15 to 20 ampere circuit $10.05 <br /> 21 to 30 ampere circuit $10.90 <br /> 31 to 40 ampere circuit $11.20 <br /> 41 to 50 ampere circuit $12.00 <br /> 51 to 70 ampere circuit $12.95 <br /> 71 to 100 ampere circuit $16.30 <br /> 101 to 200 ampere circuit $23.65 <br /> Over 200 ampere capacity $23.90 plus$7.15 for each additional 100 ampere capacity or fraction <br /> thereof <br /> Trolley and plug-in type bus-ways,per linear foot $0.60 <br /> Lighting fixtures,brackets,pendants,cord drops, $1.25 <br /> outlets,receptacles,switches and other lamp holding <br /> devices,each on existing circuits <br /> Multi-outlet assemblies,light tracts, per linear foot $0.90 <br /> Department Responsible for Revision:Finance Chapter 6.4 <br /> 05/06/2013 Page 4 <br />