My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2014 0121
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0121
>
8C Consent 2014 0121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:09:35 AM
Creation date
1/15/2014 6:04:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/21/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0121 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0121
Reso 2014-006
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AN City of San Leandro <br />Meeting Date: January 21, 2014 <br />ONR x419 ` Staff Report <br />File Number: 13-623 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.C. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Awarding a Construction Contract to Vortex <br />Marine Construction, Inc. for the Monarch Bay Drive Bridge Maintenance and <br />Repair Project, Project No. 12-150-38-324 <br />SUMMARY AND RECOMMENDATIONS <br />The subject project will perform the work necessary to extend the life of the bridge that carries <br />Monarch Bay Drive over an Alameda County Flood Control canal. Staff recommends that the <br />City Council award the contract to the lowest responsible bidder, Vortex Marine Construction, <br />Inc., in the amount of $243,600 for the subject project. <br />BACKGROUND <br />The City owns and maintains several bridges, some of which are periodically inspected by <br />Caltrans. Recent inspection reports for the bridge that carries Monarch Bay Drive over an <br />Alameda County Flood Control canal located immediately south of Marina Park indicate that <br />some of the concrete is damaged, that the bank near the northern abutment has eroded, and <br />small cracks are present in the deck which should be sealed to prevent water entry. <br />Analysis <br />The bids were opened on December 11, 2013. Eleven bids were received ranging from <br />$243,600 to $419,800. Vortex Marine Construction, Inc. was determined by staff to be the <br />apparent lowest responsible bidder. The engineer's estimate for the work was $230,400. <br />Staff verified that the contractor has a valid license with the Contractors State License Board. <br />Current Agency Policies <br />Maintain and enhance the City's infrastructure. <br />City of San Leandro Page 1 Printed on 1/14/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.