Laserfiche WebLink
• Consultant will submit up to 8 stabilized samples (4 for the fill and 4 for the sludge) to a certified <br />laboratory for Contaminant Reduction Confirmation Testing, specifically: <br />o Total Lead using EPA Method 6010 <br />o Soluble Lead using WET and TCLP methods <br />• Prepare letter report describing the findings of the chemical investigation and bench -scale <br />feasibility study. <br />Task 3 – Prepare Plans and Specifications <br />Consultant will prepare plans and specifications for bidding based on the information from Tasks 1 and 2. <br />Deliverables will include drawing and specification packages at 50 percent, 90 percent, and 100 percent <br />completion for City's review and comments. <br />Task 4 – Meetings and Consultation <br />Upon City's request, Consultant will provide limited geotechnical and/or hazardous waste consultation as <br />requested. Fee for this task has included costs to consult and strategize with the City, including <br />accompanying the City to two 2 -hour meetings at the RWQCB.. <br />Task 5 – Topographic Survey <br />Consultant will survey topographic data for sludge drying beds 5 & 6 and the western portion of the pond. <br />The survey data will be tied to the ground control established in 2008. The data for the beds will consist of <br />breakline(s) around the "toe" of the pile(s) and significant terrain breaks on the surface of the material. For <br />the pond, Consultant will survey a few points along the top of the adjoining roadway to verify the 2008 data, <br />the top and toe of the slope, and a grid of points on the bottom. <br />DELIVERABLES <br />The following deliverables will be provided to City: <br />• Draft and final geotech report (Task 1). 3 hard copies and pdf will be provided. <br />• Letter report on chemical investigation and bench -scale feasibility study (task 2). 3 hard copies and <br />pdf will be provided. <br />• 50 percent, 90 percent and final (bid) plans and specifications. Six hard copies (3 half size and 3 <br />full size) of the 50% and 90% drawings will be provided. Three hard copies of the 50% and 90% <br />specs will be provided. Pdfs and CAD files of the final drawings and pdfs and word files of the final <br />specs will be provided. <br />• Construction cost estimates to accompany each progress submittal. <br />• AutoCAD drawing file containing the terrain data collected for beds 5 and 6 and the western end of <br />the pond. The data set will be comprised of breaklines and mass points suitable for generation of a <br />digital terrain model. <br />• MicroStation design file containing the terrain data collected for beds 5 and 6 and the western end <br />of the pond. The data set will be comprised of breaklines and mass points suitable for generation <br />of a digital terrain model. <br />Consulting Services Agreement between [EFFECTIVE DATE] <br />City of San Leandro and —Exhibit A Page 4 of 5 <br />