Laserfiche WebLink
CONFIDENTUIL: ATTORNEY•CUENT AND ATTORNEY WORK•PRODUCT PRIVILEGED; <br />EXEMPT FROM DISCLOSURE - ABSOLUTELY PROHIBRED FROM DISSEMINATION OUTSIDE PORT <br />Airport Development Program <br />Proposed Settlement Terms <br />San Leandro and School Districts v. Port) <br />Original'. Joint :Proposal,'City /District s'Proposed Port Counter <br />jNew: >Proposal ` .Offer <br />1. Runway Policy - Port to Add Districts to 90 -day Counter - offer To District: <br />formalize its policy consultation Districts included in 90- <br />against use of North Field day consultation <br />runways for operations over <br />San Leandro by heavy com- <br />mercial passenger aircraft <br />operations, except in lim- <br />ited circumstances; no <br />change in policy without <br />90 -day consultation with <br />City <br />2. ILS Relocation Port OK Include in each counter- <br />immediately to initiate.offer <br />technical studies for relo- <br />cation of ILS from Runway <br />27R to 27L <br />3. School Insulation <br />a) Tier 1 Schools: Port Add 2 more schools from Counter -offer to District: <br />to do sound study on 3 Tier•2) to Tier 1. Addi- Port will do sound study <br />schools nearest airport tional cost to Port of S2 for the 2 additional <br />based on worst case fore- million to $3 million)school's based on worst case <br />cast 2010 operations, and 2010 forecasts but will in- <br />pay to insulate all class-sulate only classrooms ac- <br />rooms so special peak hours tually needing insulation <br />45 db LEQ standard met, but to meet special peak hour <br />insulation required even if 45 dBA LEQ standard for <br />not necessary to meet spe-worst case forecast 2010 <br />cial peak hour 45 dB LEQconditions. Very unlikely <br />standard. Exceeds any le-any classroom in 2 addi- <br />gal standard or CEQA re-tional schools will require <br />quirement) Cost to Port:insulation, so only cost to <br />3 million to $4.5 million Port should be incremental <br />cost of sound study.) <br />Port does sound study City /Districts' consultant Counter - offer to District: <br />does. sound study at Port Port will cooperate with <br />cost District's consultant in <br />doing study and construc- <br />tion specifications. Ap- <br />plies to noise studies for <br />Tiers 1, 2 and 3 schools) <br />b) Tier 2 Schools: Port <br />to do sound study, based on See a) above as to 2 of Counter - offer to District: <br />existing operations, on 4 Tier 2- schools See a) above. To extent <br />schools further from Air-the 2 Tier 2 school class -' <br />port than Tier 1 schools,rooms are not insulated per <br />but no insulation. If a a) above, they will be <br />Tier 2 school in the future treated the same as a Tier <br />169.05- 1