Laserfiche WebLink
Original Joint::Proposal*City /Districts!:Proposed. Port Counter <br />New:Proposal Offer <br />comes within Airport's 65 +3 school in (c) below. <br />CNEL noise contour, Port <br />will do another sound study <br />based on then existing op- <br />erations and insulate all <br />classrooms as may be neces- <br />sary to meet special peak <br />hour 45 dB LEQ standard. <br />c) Tier 3 Schools: If OK but City /Districts' Counter - offer to District: <br />any of 3 Tier 3 schools in consultant to do sound See a) above on who does <br />the future come within the study at Port cost),sound study. <br />Port's, 65+ CNEL contours, <br />Port will do a noise study <br />based on then existing op- <br />erations and insulate all <br />classrooms as may be neces- <br />sary to meet special peak <br />hour 45 d0A LEQ- standard <br />4. Residential Insulation <br />a) Mulford Gardens Insu- Insulate an additional 400 Counter -offer to City: <br />lation: Port will do sound residences, located in ex- No change from original <br />study and insulate about panded Mulford Garden Area, joint proposal.Except <br />100 single- family houses and in portions of Davis for counter -offer on who <br />and condominiums in Mulford West and Timothy Lane ar- does sound study, see 3(a) <br />Gardens area from Neptune eas. Additional Cost to above.) <br />Drive to Garfield School to Port of about $6 million.) <br />satisfy State's 45 dB CNEL City's consultant does <br />habitable room standard. sound study at Port cost. <br />Port will insulate even if <br />45 dB CNEL habitable room <br />standard is met without in- <br />sulation. Exceeds any le- <br />gal standard or CEQA re- <br />quirement.) Cost to Port: <br />1.5 million <br />b) Timothy Lane /Davis Insulate the 200 - 250 resi Counter - offer to City: No <br />West Insulation: If Port dences now.Additional change from original, joint <br />terminates San Leandro Run- cost to Port of between $3 proposal.Except for <br />way Policy see 1. above), million and $4 million, in- counter -offer on who does <br />Port will do sound study cluded in $6 million addi- sound study, see 3(a) <br />and insulate approximately tional cost in 4(a) above.) above.) <br />200 -250 residences in these City's consultant - does <br />areas, even if 45 dB CNEL sound study at Port cost. <br />habitable standard is met <br />without insulation. Even. <br />under 2010 worst case fore- <br />cast conditions, the Port <br />would be required to insu -' <br />late only approximately 50 <br />residences at a cost of <br />about $750,000. Insulation <br />offered by Port would cost <br />between 3 million to 4 <br />million if the Runway Pol- <br />icy is terminated.) <br />c) SIP Assistance Pro OK, subject to City's new. Counter - offer to City: No <br />gram:Port to provide proposals. in a) and b) change to original joint <br />Airport Development Program <br />Proposed Settlement Terms <br />San Leandro and School Districts v. Port) <br />16905- 1 <br />2