My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2014 0407
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0407
>
8D Consent 2014 0407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:12:55 AM
Creation date
4/2/2014 4:32:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/7/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0407 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0407
Reso 2014-028
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: April 7, 2014 <br />ONR x419 ` Staff Report <br />File Number: 14-079 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.D. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Accepting the Work for the Westgate Soundwall <br />Repair Project, Project No. 2012.0200 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends the City Council accept the work by Pleasanton Engineering Contractors, <br />Inc., release the performance and payment bonds after the applicable statute of limitations <br />expires, file the Notice of Completion and release the maintenance bond upon completion of <br />the one-year maintenance period to the satisfaction of the Engineering and Transportation <br />Director. <br />BACKGROUND <br />In April 2011 and again in May 2011, the Police Department reported incidents involving <br />automobile collisions into the soundwall along the east side of Westgate Parkway. The two <br />separate collisions were both single vehicle collisions with the wall at approximately the same <br />location, causing noticeable distress to the wall structure. <br />The soundwall separates Westgate Parkway from the backyards of residential properties <br />along Timothy Drive and Marybelle Avenue. The wall was constructed when the property was <br />a privately owned industrial site and became the City's responsibility when the right of way <br />was acquired in 1987. <br />The project demolished and replaced the distressed section of soundwall. The replaced <br />section meets current Building Code regulations. <br />Analysis <br />On September 6, 2013, Pleasanton Engineering Contractors, Inc. was awarded the <br />construction contract. Construction began on November 8, 2013. The completed work was <br />inspected and found in accordance with the project specifications and City standards. <br />City of San Leandro Page 1 Printed on 4/1/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.