Laserfiche WebLink
• <br /> Exhibit 1 <br /> Mitigated Negative Declaration(with Initial Study,comments received from Caltrans, response to Caltrans, <br /> soN£ comments received from Public Utilities Commission and EBMUD,and Mitigation Monitoring Plan <br /> _ F,yyo <br /> l :, y® r o CITY OF SAN LEANDRO <br /> -44Pofias•'� MITIGATED NEGATIVE DECLARATION <br /> Notice is hereby given that the City of San Leandro finds that no significant effect on the environment <br /> as prescribed by the California Environmental Quality Act of 1970, as amended will occur for the <br /> following proposed project: <br /> I. PROJECT NAME: San Leandro Downtown Technology Campus/Westlake Development <br /> Partners, LLC., Development Agreement Lot Line Adjustment/Planned Development/Site <br /> Plan Review. Planning Case File: PLN2013-00045 <br /> II. PROJECT APPLICANT: Gary.Wong; President, Westlake Development Partners, LLC., <br /> 520 El Camino Real, 9th Floor,San Mateo,California 94402-1722 <br /> III. PROJECT LOCATION: The subject property encompasses an area totaling 317,600 square <br /> feet, or approximately 7.3 acres (including 1.8 acre of City right-of-way to be vacated). The <br /> site is located generally at 1333 Martinez Street and bounded by West Estudillo Avenue to the <br /> north, Thornton Street on the south, Alvarado Street on the west and Martinez Street on the• <br /> east. The western boundary is adjacent to the Southern Pacific Railroad right of way. <br /> (Alameda County Assessor Parcel Numbers: 75-47-2,75-47-7,75-47-3-2; and 75-42-2-1) <br /> IV. PROJECT DESCRIPTION: <br /> The proposed project is a multi-phase, transit-oriented development project located adjacent to the <br /> Downtown San Leandro BART Station. The project will be the first development to implement the <br /> City's Transit Oriented Development Strategy (TOD Strategy) and is being evaluated under the <br /> Downtown Transit Oriented Strategy(TOD) EIR that was certified on September 4,2007. • <br /> • The 7.3-acre project site encompasses four separate parcels, identified as 1333 Martinez Street in this <br /> document. The project site is surrounded by professional office building to the north, industrial uses <br /> to the south, light industrial to the west and the San Leandro BART Station to the east. The site is <br /> vacant, relatively flat and has been previously graded and disturbed. <br /> • The proposed project includes the development of an Office/Technology Campus with up to a <br /> maximum of 500,000 square feet of office and other uses located in multiple buildings. The proposed <br /> Development Agreement, Lot Line Adjustment, Planned Development, and Site Plan Review Permit <br /> applications are the subjects of this review. It is expected that development will occur.in three or more <br /> phases with a .132,000 square foot, six-story technology-focused office building and related site <br /> improvements are proposed in Phase 1. The project will be designed to meet LEED "Gold" • <br /> requirements. Formal certification may or may not occur. <br /> Phase I will also include on-site and off-site improvements including landscaping, bike path, <br /> pedestrian path and utilities. Surface parking will be provided for the development of Phase I while <br /> future phases will require the construction of a multi-level parking structure. On-site parking is <br /> expected to be provided at a maximum ratio of four (4) spaces per 1,000 square feet of building area <br /> during Phase 1. The parking ratio for future phases may be potentially reduced if reduced demand is <br /> demonstrated. <br />