My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2014-008
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2014
>
MO 2014-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2014 4:09:22 PM
Creation date
4/10/2014 3:53:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
4/7/2014
Retention
PERM
Document Relationships
4A Public Hearing 2014 0407
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0407
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ij <br /> • • <br /> �• EAST MUNICIPABAY L UTILITY DISTRICT <br /> • <br /> ii <br /> . January 24,2014 ii <br /> li <br /> Elmer Penaranda, Senior Planner <br /> San Leandro Community Development Department <br /> 835 East 14th Street <br /> San Leandro, CA 94577 f <br /> I <br /> t <br /> Re: Notice of Intent to Adopt a Mitigated Negative Declaration for San Leandro <br /> II <br /> Downtown Technology Campus, San Leandro. <br /> II <br /> Dear Mr. Penaranda: • ' . t <br /> East Bay Municipal Utility District(EBMUD) appreciates the opportunity to•comment on 11 <br /> the Mitigated Negative Declaration for the San Leandro Downtown Technology Campus i <br /> located at 1333 Martinez Street in the City of San Leandro. EBMUD has the following 1 <br /> comments. <br /> WATER SERVICE <br /> . I i <br /> EBMUD's Central Pressure Zone, with a service elevation between 0 and 100 feet, will <br /> 1 ! <br /> serve the proposed development. A main extension, at the project sponsor's expense, will <br /> be required to serve the proposed.development. Off-site pipeline improvements, also at t <br /> the project sponsor's expense,may be required to meet domestic demands and fire flow <br /> requirements set by the local fire department. Off-site pipeline improvements include,but i <br /> • are not limited to, replacement of existing water mains to the project site. When the <br /> development plans are finalized, the project sponsor should contact EBMUD's New <br /> • <br /> Business Office and request a water service estimate to determine costs and conditions <br /> for providing water service to the proposed development.Engineering and installation of <br /> Water Mains and services requires substantial lead-time,:which should be provided for in { <br /> the project sponsor's development schedule. <br /> t <br /> l <br /> The project sponsor should be aware that EBMUD will not inspect, install or maintain i <br /> pipeline in contaminated soil or groundwater(if groundwater is present at any time i <br /> during the year at the depth piping is to be installed) that must be handled as a hazardous <br /> waste or that may pose.a health and safety risk to construction or maintenance personnel <br /> wearing Level D'personal protective.equipment.Nor will EBMUD install piping in areas <br /> where groundwater contaminant concentrations exceed specified limits for discharge to <br /> sanitary sewer systems:or sewage treatment plants. Project.sponsors for EBMUD services <br /> requiring excavation in contaminated areas niust subniit copies of existing information i <br /> regarding soil and groundwater quality within or adjacent to the project boundary. <br /> • <br /> 375 ELEVENTH STREET.OAKLAND. CA 046074740. TOLL FREE 7-B66-40-EBMUD • <br /> owo-.— • <br />
The URL can be used to link to this page
Your browser does not support the video tag.