My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2014-008
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2014
>
MO 2014-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2014 4:09:22 PM
Creation date
4/10/2014 3:53:48 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
4/7/2014
Retention
PERM
Document Relationships
4A Public Hearing 2014 0407
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0407
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elmer Penaranda, Senior Planner <br /> January 24,2014 <br /> Page 2 <br /> In addition,the project sponsor must provide a legally sufficient, complete and specific <br /> written remedial plan establishing the methodology, planning and design of all necessary <br /> systems for the removal, treatment, and disposal of all identified contaminated soil and/or <br /> groundwater. EBMUD will not design the installation of pipelines until such time as soil <br /> and groundwater quality data and remediation plans are received and reviewed and will <br /> not install pipelines until remediation has been carried out and documentation of the <br /> effectiveness of the remediation has been received and reviewed. If no soil or <br /> groundwater quality data exists or the information supplied by the project sponsor is <br /> • insufficient EBMUD may require the applicant to perform sampling and analysis to • <br /> characterize the soil being excavated and groundwater that may be encountered during <br /> excavation or perform such sampling and analysis itself at the project sponsor's expense. <br /> WATER CONSERVATION <br /> The proposed project presents an opportunity to incorporate water conservation <br /> measures. EBMUD requests that the City include in its conditions of approval a <br /> requirement that the project sponsor comply with the California Model Water Efficient <br /> Landscape Ordinance (Division 2, Title 23, California Code of Regulations, Chapter 2.7, <br /> Sections 490 through 495). The project sponsor should be aware that Section 31 of <br /> EBMUD's Water Service Regulations requires that water service shall not be furnished <br /> for new or expanded service unless all the applicable water-efficiency measures <br /> described in the regulation have been reviewed and approved by EBMUD. <br /> If you have any questions concerning this response,please contact David J. Rehnstrom, <br /> Senior Civil Engineer, Water Service Planning at(510) 287-1365. <br /> Sincerely, • <br /> • fp(liWilliam R. Kirkpatrick <br /> Manager of Water Distribution Planning <br /> WRK:GJC:sb <br /> sbl4 025 <br /> • <br /> cc: Gary Wong, President <br /> Westlake Development Partners, LLC• • <br /> 520 El Camino Real, 9th Floor <br /> San Matero, CA 94402-1722 <br />
The URL can be used to link to this page
Your browser does not support the video tag.