Laserfiche WebLink
Elmer Penaranda, Senior Planner <br /> January 24,2014 <br /> Page 2 <br /> In addition,the project sponsor must provide a legally sufficient, complete and specific <br /> written remedial plan establishing the methodology, planning and design of all necessary <br /> systems for the removal, treatment, and disposal of all identified contaminated soil and/or <br /> groundwater. EBMUD will not design the installation of pipelines until such time as soil <br /> and groundwater quality data and remediation plans are received and reviewed and will <br /> not install pipelines until remediation has been carried out and documentation of the <br /> effectiveness of the remediation has been received and reviewed. If no soil or <br /> groundwater quality data exists or the information supplied by the project sponsor is <br /> • insufficient EBMUD may require the applicant to perform sampling and analysis to • <br /> characterize the soil being excavated and groundwater that may be encountered during <br /> excavation or perform such sampling and analysis itself at the project sponsor's expense. <br /> WATER CONSERVATION <br /> The proposed project presents an opportunity to incorporate water conservation <br /> measures. EBMUD requests that the City include in its conditions of approval a <br /> requirement that the project sponsor comply with the California Model Water Efficient <br /> Landscape Ordinance (Division 2, Title 23, California Code of Regulations, Chapter 2.7, <br /> Sections 490 through 495). The project sponsor should be aware that Section 31 of <br /> EBMUD's Water Service Regulations requires that water service shall not be furnished <br /> for new or expanded service unless all the applicable water-efficiency measures <br /> described in the regulation have been reviewed and approved by EBMUD. <br /> If you have any questions concerning this response,please contact David J. Rehnstrom, <br /> Senior Civil Engineer, Water Service Planning at(510) 287-1365. <br /> Sincerely, • <br /> • fp(liWilliam R. Kirkpatrick <br /> Manager of Water Distribution Planning <br /> WRK:GJC:sb <br /> sbl4 025 <br /> • <br /> cc: Gary Wong, President <br /> Westlake Development Partners, LLC• • <br /> 520 El Camino Real, 9th Floor <br /> San Matero, CA 94402-1722 <br />