My WebLink
|
Help
|
About
|
Sign Out
Home
4B Public Hearing 2014 0505
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0505
>
4B Public Hearing 2014 0505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 4:17:51 PM
Creation date
4/30/2014 9:35:40 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/5/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0505 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
PowerPoint 4B&4C Public Hearing 2014 0505 Fee and Tax Increases 2014-15
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0505
Reso 2014-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />3 Electrical Permit <br />A. Filing and Issuance $92 plus the amount shown below for <br />each electrical item <br />CPI <br /> B. Plan-Check, when applicable Direct Cost (1) <br />For new Residential Construction and additions with valuations over <br />$100,000 included all circuits, service and sub panels. <br />13% of building permit fees <br />All Electrical circuits $ 12.00 <br />15 to 20 ampere circuit $10.05 Remove <br />21 to 30 ampere circuit $10.90 Remove <br />31 to 40 ampere circuit $11.20 Remove <br />41 to 50 ampere circuit $12.00 Remove <br />51 to 70 ampere circuit $12.95 Remove <br />71 to 100 ampere circuit $16.30 Remove <br />101 to 200 ampere circuit $23.65 Remove <br />Over 200 ampere capacity $23.90 PLUS $7.15 for each additional <br />100 ampere capacity or fraction <br />thereof <br />Remove <br />Trolley and plug-in type bus-ways, per linear foot $0.60 0.61$ CPI <br />Lighting fixtures, brackets, pendants, cord drops, outlets, receptacles, <br />switches and other lamp holding devices, each on existing circuits <br />$1.25 1.30$ CPI <br />Multi-outlet assemblies, light tracts, per linear foot $0.90 0.92$ CPI <br />Temporary power service pole or pedestal, each $29.20 29.80$ CPI <br />Temporary distribution system (for construction sites, Xmas tree lots, etc.), <br />each <br />$29.20 29.80$ CPI <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />Circuits: Installation, replacement or alteration of each electrical circuit (includes related outlets, switches, receptacle and lighting fixtures): <br />$94 plus the amount shown <br />below for each electrical item <br />New Consolidated Fee <br /> 6
The URL can be used to link to this page
Your browser does not support the video tag.