Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />3 Electrical Permit <br />A. Filing and Issuance $92 plus the amount shown below for <br />each electrical item <br />CPI <br /> B. Plan-Check, when applicable Direct Cost (1) <br />For new Residential Construction and additions with valuations over <br />$100,000 included all circuits, service and sub panels. <br />13% of building permit fees <br />All Electrical circuits $ 12.00 <br />15 to 20 ampere circuit $10.05 Remove <br />21 to 30 ampere circuit $10.90 Remove <br />31 to 40 ampere circuit $11.20 Remove <br />41 to 50 ampere circuit $12.00 Remove <br />51 to 70 ampere circuit $12.95 Remove <br />71 to 100 ampere circuit $16.30 Remove <br />101 to 200 ampere circuit $23.65 Remove <br />Over 200 ampere capacity $23.90 PLUS $7.15 for each additional <br />100 ampere capacity or fraction <br />thereof <br />Remove <br />Trolley and plug-in type bus-ways, per linear foot $0.60 0.61$ CPI <br />Lighting fixtures, brackets, pendants, cord drops, outlets, receptacles, <br />switches and other lamp holding devices, each on existing circuits <br />$1.25 1.30$ CPI <br />Multi-outlet assemblies, light tracts, per linear foot $0.90 0.92$ CPI <br />Temporary power service pole or pedestal, each $29.20 29.80$ CPI <br />Temporary distribution system (for construction sites, Xmas tree lots, etc.), <br />each <br />$29.20 29.80$ CPI <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />Circuits: Installation, replacement or alteration of each electrical circuit (includes related outlets, switches, receptacle and lighting fixtures): <br />$94 plus the amount shown <br />below for each electrical item <br />New Consolidated Fee <br /> 6