Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES <br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />2 Building Permit (Continued) <br />C. Satellite Dish Antenna $137.00 CPI <br />D. Minor Kitchen Remodel Permit:a.Single kitchen or bath remodel (permit <br />to include electrical, plumbing, <br />mechanical ventilation and appliances) <br />$355.00 <br />CPI <br />(Limited to work without framing changes.)b. Additional bath remodel when <br />concurrent with kitchen or bath remodel <br />within the same structure and at same <br />time $147.00 <br />CPI <br />E. Plan Checking <br />Clarified description <br />(1) Residential Fire Sprinklers for 1 & 2 Family Dwelling New <br />Construction. Effective January 1, 2011, fire sprinkler systems became <br />mandatory in 1 and 2 family dwellings. The Division of Building and <br />Safety will be reviewing and inspecting the installation of these systems. <br />$480.00 flat fee to include plan review <br />and inspection of residential fire sprinkler <br />systems when installed in conjunction <br />with new 1 & 2 family dwelling <br />construction. <br />CPI <br />(2) In-house- During Regular Working Hours 80% of the building permit fee <br />For Master Plans (i.e. identical buildings built by the same <br />builder on the same lot or in the same tract and for which <br />building permits are issues at the same time): <br />Changes, revisions, or additions to plans previously checked.Direct Cost(1) - 1 hour minimum charge <br />Outside plan checking services as utilized at discretion of <br />Building Official. <br />Same as for In-house- During Regular Working Hours <br />Additional Plan Review after the first recheck Direct Cost (1) - 1 hour minimum per occurrence <br />(3) In-house - Outside of Normal Business Hours When Requested by <br />Applicant <br />(4) By Outside Consultant, When Requested by Applicant <br />(5) Over the Counter for Small Changes, Revisions or Additions, when <br />requested by applicant <br />Direct Cost (1), with minimum of one-half <br />hour <br />(6) Expedited Plan Check when requested by applicant & when plan <br />reviewer is available <br />Full plan check fee plus one and one-half times Direct Cost(1) <br />(7) Phased Plan check- when the foundation or another part of the <br />building needs approval and permit issuance prior to the whole building <br />One and One-half (1-1/2) times the full <br />plan check fee for the entire building <br />(8) Alternate Methods and Materials Direct cost (1) 1 hour minimum charge <br />(9) Energy Conservation: for all buildings subject to the California <br />Energy Commission’s conservation regulations <br />20% of Building Permits <br />(10) California Health & Safety Code, section 18949.29 fee applied to all <br />projects requiring a "Building Permit". <br />5% of Building Permit Fee - For training and <br />continuing education required by the California Health <br />and Safety Code, section 18949. <br />Equal to In-house - During Regular Working Hours <br />PLUS Consultant's fee as established by Agreement <br />(contract) between City and Consultant <br />Same as for In-house- During Regular Working Hours <br />PLUS overtime and overhead charges <br />A full plan checking fee shall be paid for each Master <br />Plan when more than one building will be built and one <br />half (50%) of the full plan checking fee shall be paid <br />for each building at time of application. <br />Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to <br />the building permit fee and shall be as follows: <br />140.00$ <br />a.Single kitchen or bath <br />remodel (permit to include <br />electrical, plumbing, <br />mechanical ventilation and <br />appliances) $363.00 <br />b. Additional bath remodel <br />when concurrent with <br />kitchen or bath remodel <br />within the same structure <br />and at same time $150.00 <br />$500.00 flat fee to include <br />plan review and inspection of <br />residential fire sprinkler <br />systems when installed in <br />conjunction with new 1 & 2 <br />family dwelling construction. <br /> 5