|
SAN LEANDRO ADMINISTRATIVE CODE FINANCE
<br />TITLE 6, Chapter 4 FISCAL YEAR 2015 PROPOSED FEES
<br />Current Fee Reference Proposed Fee Explanation of Proposed Fee Change for 2014-15
<br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California.
<br />Description
<br />PUBLIC WORKS SERVICES DEPARTMENT – Environmental Services Division Section
<br />1 Hazardous Materials Storage SLMC 3-3-300
<br />Quantity Range 1 $ 107.00 (2) Quantity Range 1
<br />$ 110.00 (2)
<br /> CPI Increase of direct fee or base tiered fee
<br />Quantity Range 2 $215.00 Quantity Range 2
<br />$220.00
<br />CPI Increase of direct fee or base tiered fee
<br />Quantity Range 3 $310.00 Quantity Range 3
<br />$317.00
<br />CPI Increase of direct fee or base tiered fee
<br />Quantity Range 4 $406.00 Quantity Range 4
<br />$415.00
<br />CPI Increase of direct fee or base tiered fee
<br />Quantity Range 5 $508.00 Quantity Range 5
<br />$519.00
<br />CPI Increase of direct fee or base tiered fee
<br />B. Annual Fees for Storage of Radioactive Materials (1)$150.00 $153.00 CPI Increase of direct fee or base tiered fee
<br />C. Aboveground Tank Installation Permit (3)
<br />· First Tank $790.00 $808.00 CPI Increase of direct fee or base tiered fee
<br />· Each Additional $263.00 $269.00 CPI Increase of direct fee or base tiered fee
<br />D. APSA Facility Annual Fee
<br /> Qualified Facility (Tier I/Tier II)$132.00 $135.00 CPI Increase of direct fee or base tiered fee
<br /> Non-Qualified Facility (full SPCC)$232.00 $237.00 CPI Increase of direct fee or base tiered fee
<br />2 Accidental Release Program: Review of RMP by:SLMC 3-3-300
<br />City Staff $132.00/hour $135.00/hour CPI Increase of direct fee or base tiered fee
<br />Outside consultant Direct Costs plus 10%
<br />Annual Fee
<br />Program 1 $514.00 $525.00 CPI Increase of direct fee or base tiered fee
<br />Program 2 $668.00 $682.00 CPI Increase of direct fee or base tiered fee
<br />Program 3 $822.00 $887.00 Tiered fee calculation correction
<br />3 Underground Hazardous Materials Storage SLMC 3-3-300
<br />A. Annual Operating Permit (4): Each Tank $113.00 $115.00 CPI Increase of direct fee or base tiered fee
<br />B. New Tank Installation (5)
<br />· First Tank $2,371.00 $2,423.00 CPI Increase of direct fee or base tiered fee
<br />· Each Additional $263.00 $269.00 CPI Increase of direct fee or base tiered fee
<br />C. Tank Removal, Repair, Alterations (6)
<br />· First Tank $1,317.00 $1,346.00 CPI Increase of direct fee or base tiered fee
<br /> Each Additional $211.00 $215.00 CPI Increase of direct fee or base tiered fee
<br />D. Minor Repairs and Alterations Hourly Rate $132.00/hour $135.00/hour CPI Increase of direct fee or base tiered fee
<br />4 Contaminated Site Cleanup Program
<br />A. Oversight of Remedial Investigations and Actions
<br />· City Staff Hourly Rate $132.00/hour $135.00/hour CPI Increase of direct fee or base tiered fee
<br />· Outside Consultant Direct Costs plus 10%
<br />5 Hazardous Waste On-site Treatment CA Health & Safety Code; Title 27
<br />A. Annual Fees (4)
<br />· Permit-by-Rule $981.00 $1,002.00 Tiered fee calculation correction
<br />· Conditional Authorization $418.00 $428.00 Base fee CPI
<br />· Conditional Exempt $114.00 $116.00 Tiered fee calculation correction
<br />(1)
<br />(2)Quantity Range 1 Less than or equal to 500 pounds, 55 gallons, or 2,000 cubic feet at STP.
<br />Quantity Range 2 Greater than 500 pounds, 55 gallons, or 2,000 cubic feet at STP, but less than or equal to 5,000 pounds, 550 gallons or 20,000 cubic feet at STP, respectively.
<br />Quantity Range 3 Greater than 5,000 pounds, 550 gallons, or 20,000 cubic feet at STP, but less than or equal to 50,000 pounds, 5,500 gallons or 200,000 cubic feet at STP, respectively.
<br />Quantity Range 4 Greater than 50,000 pounds, 5,500 gallons, or 200,000 cubic feet at STP, but less than or equal to 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP, respectively.
<br />Quantity Range 5 Greater than 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP.
<br />(3)
<br />(4)
<br />(5)Includes plan review, field inspections, and permit processing. Additional time will be charged at the current hourly rate.
<br />(6)Includes plan review, field inspections, and permit processing. Additional time will be charged at the current hourly rate.
<br />
<br />Includes plan review, field inspections, and permit processing. Time for inspections is two hours for the first tank and one hour each additional tank. Additional inspections will be charged at the current
<br />hourly rate.
<br />Includes permit processing and two inspections annually (one annual and one re-inspection) for compliance with the Uniform Fire Code, review of the HMBP, and review of all emergency response plans
<br />Includes permit processing and two inspections annually (one annual and one re-inspection) for compliance with applicable federal and state underground tank and/or hazardous waste laws and
<br />regulations and/or the Uniform Fire Code. Additional inspections will be charged at the current hourly rate.
<br />A. Annual fees for storage of combustible liquids, corrosives, flammable
<br />gases, flammable liquids, flammable solids, nonflammable gases, organic
<br />peroxides, other regulated materials, oxidizers, poisonous gasses,
<br />poisonous materials (1)
<br /> 31
|