Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 ADOPTED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general <br />laws of the State of California. <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (cor <br />5_Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />Fans or blowers connected to any heating system which are not part of the _$9.30 <br />Commercial range hoods, including vent, each <br />Flues: <br />Minimum (one or two flues) <br />Each flue over two (each) <br />Ventilating System for Kitchen, Bath, etc.: <br />Minimum (one or two systems) <br />Each system over two <br />General Mechanical: <br />Incinerators — domestic, each <br />Incinerators — commercial/industrial, each <br />Garbage chutes, each <br />Fire dampers, each <br />Smog control after burners, commercial/industrial, each <br />Refrigeration system — commercial/industrial, each syst <br />Condensate drain system, each inlet <br />Boilers: <br />Heat pumps, each <br />To 100,000 BTU each <br />Over 100,000 to 500,000 BTU, each <br />Over 500,000 to 1,000,000 BTU, each <br />Over 1,000,000 BTU, each <br />Evaporative Cooler. each <br />Ovens, dryers, cookers, fryers, kettles, etc. each <br />Industrial processing exhaust systems, each system <br />Manufactured spray booths, each <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission's conservation regulations (when <br />Signs <br />Filing and Issuance Fee <br />Sign permit fees are flat rate as indicated below and based on all signs being c <br />Rates include review and inspection <br />1 to 2 signs (non electric, attached to building) <br />3 to 4 signs (non electric, attached to building) <br />5 plus signs (non electric, attached to building) <br />Monument signs (each) <br />Electric self-contained signs, initially installed bearing Underwriters' label of <br />approval, each <br />Relocation or alteration of any sign electronically or mechanically, but not <br />including replacement of tubing, transformers and such parts subject to <br />failure; or shop inspection by the local inspection department in lieu of a UL <br />label (a local electrical inspection department label of approval shall be <br />required), each <br />Excavation and Grading <br />Minimum Fee <br />Plan Checking <br />a <br />$10.90 <br />$6.70 <br />$10.90 <br />$9.30 <br />$15.80 <br />$61.90 <br />$20.30 <br />$9.30 <br />$42.10 <br />$53.80 <br />$4.10 <br />$75.00 <br />$24.20 <br />$21.30 <br />$33.60 <br />$44.40 <br />$55.10 <br />$22.20 <br />Direct Cost (1) with a minimum charge of $62.00 <br />$94.00 plus fees shown below. Fees for sign permits are in addition to any <br />required electrical permit fees <br />the same property and on the same permit. <br />50.00 <br />$28.60 <br />$75.00 <br />$71.00 PLUS the fees shown in the fee schedule as adopted by the City <br />Council except that wherever an hourly rate is shown, the rate shall be <br />equal to the Direct Cost (1) or whichever is greater. <br />$71.00 PLUS the fees shown in the fee schedule as adopted by the City <br />Council except that wherever an hourly rate is shown, the rate shall be <br />equal to the Direct Cost (1) or whichever is greater. <br />9 <br />