Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 ADOPTED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general <br />laws of the State of California. <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />4 Plumbing Permit (Continued) <br />Septic tank outfit complete ( installation or removal/abandonment), each $62.20 <br />Sewer extension, each J$21.10 <br />Site sewer lateral between building and street main, new or repairs or J$39.70 <br />Temporary privy or vault (chemical toilet), each <br />$18.10 <br />Gray Water Systems (fee to cover review of plans and inspection of <br />the installed system) <br />$144.10 <br />Gas Piping and Oil Piping: <br />Minimum Fee (one or two outlets) <br />$7.30 <br />Exemption: Inspection of installation of an earthquake gas shutoff valve <br />No minimum gas piping and oil piping fee <br />Each gas outlet over two <br />J$4.10 <br />Each gas meter over one (same time and place) <br />$5.30 <br />Gas line test, each test <br />$14.60 <br />Fuel oil or liquefied petroleum gas storage tanks, demolition of new _$7.90 <br />Clothes dryer - residential, each <br />Clothes dryer - commercial, each $11.40 <br />Hot Water systems, piping and equipment: <br />For steam or hot water heating piping and radiators, convectors, hot water panels, steam or hot water unit heaters, <br />clothes pressing machines of any type, and all connection to industrial and processing equipment: <br />Minimum fee (first device) $9.30 <br />Each additional device $11.90 <br />Boilers: All Sizes $75.00 <br />Solar system, including collectors, piping, tanks & exchanger, each system $48.50 <br />Energy Conservation: review of plans and/or energy forms for all buildings Direct Cost (1) with a minimum charge of $62.00 <br />subject to the California Energy Commission's conservation regulations <br />Heating, Ventilating and Air Condition or General Mechanical <br />Filing and Issuance Fee $94.00 plus the amount shown for each heating, ventilating, and air <br />conditioning item of work and each general mechanical item of work <br />For the roughing in of sheet metal or approved circulating air pipe in connection with any heating or cooling system, including air inlet or outlet <br />connections, registers and diffusers: <br />Plan Check, when applicable <br />For new Residential Construction and additions with valuations over <br />$100,000 includinq all HVAC, registers, ducts, qas line and vents. <br />Each register over two <br />Heating, cooling and ventilating appliances: <br />Gravity or forced air furnace, each (including gas fireplace inserts) <br />Residential air conditioning system <br />Unit heater, each <br />Recessed wall heater, each <br />Suspended space heater, each <br />Gas range - domestic, each <br />Gas range - commercial, each <br />Gas clothes dryer, domestic, each <br />Gas clothes dryer, commercial, each <br />Gas domestic refrigerator, each <br />Conversion burner, each <br />Circulating type room heater, each <br />Industrial and commercial heating equipment, each <br />Alterations or changes of any control system or ventilating system from <br />oriqinal installation <br />Small burner of not over 15,000 BTU per hour, steam table sterilizers, <br />Direct Cost = houriv Dersonnei charae Dius a factor of 100% for <br />Direct Cost (1) <br />10% of Building Permit Fee <br />$3.00 <br />$15.50 <br />$12.90 <br />$12.90 <br />$12.90 <br />$12.90 <br />$9.30 <br />$11.40 <br />$9.30 <br />$11.40 <br />$9.30 <br />$11.40 <br />$11.40 <br />$15.90 <br />$12.90 <br />$9.30 <br />enefits. overhead and indirect costs <br />