SAN LEANDRO ADMINISTRATIVE CODE FINANCE
<br />TITLE 6, Chapter 4 FISCAL YEAR 2015 ADOPTED FEES
<br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general
<br />laws of the State of California.
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)
<br />4 Plumbing Permit (Continued)
<br />Septic tank outfit complete ( installation or removal/abandonment), each $62.20
<br />Sewer extension, each J$21.10
<br />Site sewer lateral between building and street main, new or repairs or J$39.70
<br />Temporary privy or vault (chemical toilet), each
<br />$18.10
<br />Gray Water Systems (fee to cover review of plans and inspection of
<br />the installed system)
<br />$144.10
<br />Gas Piping and Oil Piping:
<br />Minimum Fee (one or two outlets)
<br />$7.30
<br />Exemption: Inspection of installation of an earthquake gas shutoff valve
<br />No minimum gas piping and oil piping fee
<br />Each gas outlet over two
<br />J$4.10
<br />Each gas meter over one (same time and place)
<br />$5.30
<br />Gas line test, each test
<br />$14.60
<br />Fuel oil or liquefied petroleum gas storage tanks, demolition of new _$7.90
<br />Clothes dryer - residential, each
<br />Clothes dryer - commercial, each $11.40
<br />Hot Water systems, piping and equipment:
<br />For steam or hot water heating piping and radiators, convectors, hot water panels, steam or hot water unit heaters,
<br />clothes pressing machines of any type, and all connection to industrial and processing equipment:
<br />Minimum fee (first device) $9.30
<br />Each additional device $11.90
<br />Boilers: All Sizes $75.00
<br />Solar system, including collectors, piping, tanks & exchanger, each system $48.50
<br />Energy Conservation: review of plans and/or energy forms for all buildings Direct Cost (1) with a minimum charge of $62.00
<br />subject to the California Energy Commission's conservation regulations
<br />Heating, Ventilating and Air Condition or General Mechanical
<br />Filing and Issuance Fee $94.00 plus the amount shown for each heating, ventilating, and air
<br />conditioning item of work and each general mechanical item of work
<br />For the roughing in of sheet metal or approved circulating air pipe in connection with any heating or cooling system, including air inlet or outlet
<br />connections, registers and diffusers:
<br />Plan Check, when applicable
<br />For new Residential Construction and additions with valuations over
<br />$100,000 includinq all HVAC, registers, ducts, qas line and vents.
<br />Each register over two
<br />Heating, cooling and ventilating appliances:
<br />Gravity or forced air furnace, each (including gas fireplace inserts)
<br />Residential air conditioning system
<br />Unit heater, each
<br />Recessed wall heater, each
<br />Suspended space heater, each
<br />Gas range - domestic, each
<br />Gas range - commercial, each
<br />Gas clothes dryer, domestic, each
<br />Gas clothes dryer, commercial, each
<br />Gas domestic refrigerator, each
<br />Conversion burner, each
<br />Circulating type room heater, each
<br />Industrial and commercial heating equipment, each
<br />Alterations or changes of any control system or ventilating system from
<br />oriqinal installation
<br />Small burner of not over 15,000 BTU per hour, steam table sterilizers,
<br />Direct Cost = houriv Dersonnei charae Dius a factor of 100% for
<br />Direct Cost (1)
<br />10% of Building Permit Fee
<br />$3.00
<br />$15.50
<br />$12.90
<br />$12.90
<br />$12.90
<br />$12.90
<br />$9.30
<br />$11.40
<br />$9.30
<br />$11.40
<br />$9.30
<br />$11.40
<br />$11.40
<br />$15.90
<br />$12.90
<br />$9.30
<br />enefits. overhead and indirect costs
<br />
|