Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2015 ADOPTED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general <br />laws of the State of California. <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />2_Building Permit (Continued) <br />F. Plan Checking <br />Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building <br />permit fee and shall be as follows: <br />(1) Residential Fire Sprinklers for 1 & 2 Family Dwelling New <br />$500.00 flat fee to include plan review and inspection <br />Construction. Effective January 1, 2011, fire sprinkler systems became <br />of residential fire sprinkler systems when installed in <br />mandatory in 1 and 2 family dwellings. The Division of Building and <br />conjunction with new 1 & 2 family dwelling <br />Safetywill be reviewinq and inspectinq the installation of these systems. <br />-construction. <br />(2) In-house- During Regular Working Hours <br />80% of the building permit fee <br />For Master Plans (i.e. identical buildings built by the same <br />A full plan checking fee shall be paid for each Master Plan when more than <br />builder on the same lot or in the same tract and for which <br />one building will be built and one half (50%) of the full plan checking fee <br />building permits are issues at the same time): <br />shall be paid for each building at time of application. <br />Changes, revisions, or additions to plans previously checked. <br />Direct Cost (1) - 1 hour minimum charge <br />Outside plan checking services as utilized at discretion of <br />Same as for In-house- During Regular Working Hours <br />Additional Plan Review after the first recheck <br />(3) In-house - outside of normal business hours when requested by <br />(4) By Outside consultant, when requested by Applicant <br />(5) Over the counter for small changes, revisions or additions, when <br />Direct Cost (1) - 1 hour minimum per occurrence <br />Same as for In-house- During Regular Working Hours PLUS overtime and <br />overhead charqes <br />Equal to In-house - During Regular Working Hours PLUS Consultant's fee <br />as established by Agreement (contract) between City and Consultant <br />Direct Cost (1), with minimum of one-half hour <br />(6) Expedited Plan Check when requested by applicant & when plan <br />reviewer is available <br />Full plan check fee plus one and one-half times Direct Cost (1) <br />(7) Phased Plan check- when the foundation or another part of the <br />building needs approval and permit issuance prior to the whole building <br />One and One-half (1-1/2) times the full <br />i plan check fee for the entire building <br />(8) Alternate Methods and Materials <br />Direct cost (1) 1 hour minimum charge <br />(9) Energy Conservation: for all buildings subject to the California <br />Energy Commission's conservation regulations <br />20% of Building Permits <br />(10) California Health & Safety Code (CHSC), section 18949.29 fee <br />applied to all projects requiring a "Building Permit". <br />5% of Building Permit Fee - For training and <br />continuing education required by the CHSC § 18949. <br />=Electrical Permit <br />-A. Filing and Issuance <br />$94 plus the amount shown below for each electrical item <br />1B. Plan -Check when applicable <br />IDirect Cost (1) <br />For new Residential Construction and additions with valuations over <br />$100,000 included all circuits, service and sub panels. <br />13% of building permit fees <br />Circuits: Installation replacement or alteration of each electrical circuit (includes <br />related outlets switches receptacle and lighting fixtures): <br />All Electrical circuits <br />$12.00 <br />Trolley and plug-in type bus -ways, per linear foot <br />$0.61 <br />Lighting fixtures, brackets, pendants, cord drops, outlets, receptacles, <br />switches and other lamp holding devices each on existing circuits <br />$1.30 <br />Multi -outlet assemblies, light tracts, per linear foot <br />power service pole or pedestal, each <br />$29.80 <br />_;Temporary <br />Temporary distribution system (for construction sites, Xmas tree lots, etc.), <br />each <br />1$29.80 <br />Service or Service Change: <br />Services over 600 volts: <br />Up to 200 amp each <br />1$105.30 <br />Over 200 amp, each <br />1$105.30 <br />Services 600 volts or less, each <br />Up to 200 amp capacity <br />1$36.30 <br />Over 200 amp capacity <br />;$72.60 <br />(1) Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />