My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2014 Dell
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2014
>
Agmt 2014 Dell
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2014 4:54:01 PM
Creation date
6/11/2014 4:52:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/2/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0602 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0602
Reso 2014-055
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />3 Installation and Implementation of Dell EqualLogic 3-2-1 for vSphere | v1.8 | August 22, 2013 <br />5. Design and document valid standalone iSCSI fabric(s) for the new Ethernet switches, based on <br />best practice guidelines: <br />a. Review the recommended iSCSI best practice guidelines with the customer for any (Non- <br />Dell) switches so the customer can properly configure the switches. <br />6. Storage design, VMFS partitioning planning and layout based on provided information and best <br />practices. <br />7. Determine the vCenter Server, server requirements and storage allocations: <br />a. Determine what existing database is in place and gather all necessary information: <br />i. Database type, host operating system type, connection type and database name. <br />ii. If a SQL or Oracle database is not available, SQL Express Edition will be installed as a <br />default database. <br />b. Determine and document if customer wants vCenter integrated into Active Directory®. <br />8. Server, storage, and virtual machine allocation: <br />a. Discuss vSphere basic functionality and best practices. <br />b. Storage design, VMFS partitioning planning and logical layout based on provided <br />information and best practices. <br />c. If applicable, outline image templates that will be used during the VM deployment. <br />d. Outline detailed information about VMs that will be deployed. <br />9. Gather, verify and document all relevant information regarding Physical P2V candidate hosts: <br />a. OS Version <br />b. Hostname <br />e. IP addresses of specific NICs <br />f. Administrator Login and Password <br />g. Drives (local or SAN) <br />h. Gather verify and document all relevant information regarding Applications: <br />i. Application it is running (MOM, SMS, AD, Exchange. PeopleSoft, SQL etc). <br />ii. Applications accessing any external Storage (Drives and LUNs). <br />i. Document target datastores and vSphere hosts for P2V candidates. <br />i. Verify source candidates meet P2V Specific Guidelines in this document by reviewing <br />the completed P2V Survey. <br />j. Document VM characteristics for any VMs which will be substituted in place of P2V. <br />k. Verify total P2V + Windows VMs is not more than 5. <br />i. This excludes vCenter or SANHQ server. <br />Installation of up to three Dell PowerEdge servers: <br />1. Unpack new Supported Product and inspect all hardware prior to installation. <br />2. Mount rack related hardware (such as rails, brackets and tray) onto the rack. <br />3. If needed, remove components (such as blades, power supplies and drives) from the <br />Supported Server to reduce the overall weight. <br />4. Mount the Supported Server into the rack. <br />5. Reinstall any components that were removed from the Supported Product. <br />6. Install and route power cables to the Supported Server. <br />7. Connect the Customer-provided cables to the Supported Server (such as network, keyboard, <br />mouse, and video). <br />8. Power up the Supported Server, perform initial system boot and ensure that there are no <br />visible fault indicators. <br />Installation, Implementation and testing of Dell EqualLogic solution: <br />1. Install the storage array components: <br />a. Unpack and inspect all hardware prior to installation. <br />b. Mount any necessary rack related hardware into the Dell supported rack.
The URL can be used to link to this page
Your browser does not support the video tag.