My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2014 0721
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0721
>
8G Consent 2014 0721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 11:12:12 AM
Creation date
7/16/2014 5:52:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/21/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0721 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0721
Reso 2014-087
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: July 21, 2014 <br />Staff Report <br />Agenda Section:File Number:14-261 CONSENT CALENDAR <br />Agenda Number:8.G. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for Resolution Rejecting All Bids for the Marina Community <br />Center (MCC) Storefront Window Replacement, Project Number 2005.0060 <br />SUMMARY AND RECOMMENDATIONS <br />This contract provides for the replacement of storefront windows at the Marina Community <br />Center. <br />Staff recommends that the City Council approve a resolution rejecting all bids on the subject <br />project. <br />BACKGROUND <br />The subject project’s scope is to replace four bays of storefront windows along the frontage of <br />the Marina Community Center (MCC) building. These windows have slow leaks during <br />periods of heavy rain and need replacement. <br />Analysis <br />The project was advertised for bid on June 6, 2014 and bids were opened on Tuesday, July 1, <br />2014. Four bids were received ranging from $92,849 to $150,000. Because the lowest <br />bidder did not include a required Addendum Acknowledgement, the lowest responsible bidder <br />was the second low bidder, Gammas Builders, at $131,300. This bid amount is 65% above <br />the engineer’s estimate of $79,600. <br />Rebidding this project is anticipated to result in bids closer to the engineer’s estimate. Staff <br />plans to modify the construction documents to reduce costs by adjusting contractor license <br />requirements, clarifying window specifications, and modifying project general conditions as <br />appropriate. Staff will call for a new bid and present the results to the City Council this Fall. <br />Page 1 City of San Leandro Printed on 7/15/2014
The URL can be used to link to this page
Your browser does not support the video tag.