My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2014 0721
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2014
>
Packet 2014 0721
>
8G Consent 2014 0721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 11:12:12 AM
Creation date
7/16/2014 5:52:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/21/2014
Retention
PERM
Document Relationships
_CC Agenda 2014 0721 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2014\Packet 2014 0721
Reso 2014-087
(Reference)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 14-261 <br />Applicable General Plan Policies <br />This project is consistent with General Plan Goal No. 52.07 to provide for the ongoing <br />maintenance of City-owned facilities. <br />Environmental Review <br />This project is categorically exempt from CEQA per Section 15301(c) - Existing Facilities. <br />Summary of Public Outreach Efforts <br />This project was posted on the City’s website and advertised in the Daily Review on June 6, <br />2014. Notification of this bid opportunity was also sent to local Builder’s Exchanges as well as <br />contractors who registered with the City to be informed of bidding opportunities. Bids were <br />opened on July 1, 2014. <br />After bid opening, staff contacted two bidders and another local glazing contractor to <br />understand the discrepancy in cost between the Engineer’s Estimate and the bids received. <br />Code Compliance Review <br />A City of San Leandro Building Permit will be obtained for this work. <br />Fiscal Impacts <br />Total project cost is anticipated to be $116,000; including project contingencies and City staff <br />design and construction management costs. Of this total project cost, the construction cost is <br />anticipated to be $80,000. <br />Budget Authority <br />This project is funded by Facilities Maintenance Funds in CIP account 687-18-135 in an <br />amount of $116,000. The balance remaining in this account as of June 30, 2014 is $102,924. <br />ATTACHMENT <br />·Bid Summary <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Department <br />Page 2 City of San Leandro Printed on 7/15/2014
The URL can be used to link to this page
Your browser does not support the video tag.