My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2014 4 LEAF Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2014
>
Agmt 2014 4 LEAF Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 3:42:38 PM
Creation date
7/29/2014 3:42:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/7/2014
Retention
PERM
Document Relationships
Reso 2014-067
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4LEAF, Inc. will maintain copies of all City Building Code amendments and policies. We will <br /> coordinate with the City staff to apply codes, regulations and policies in a manner that is <br /> consistent with City policies and interpretations. As necessary,we will provide assistance to City <br /> staff to resolve project specific issues. <br /> 3. Conduct necessary site analysis when required. <br /> The Staff at 4LEAF, Inc. is available to meet with permit applicants and/or City staff on an as <br /> needed basis to provide technical support. We have often been involved in meetings with <br /> architects and jurisdictional personnel to resolve basic code items during the design stage. In <br /> special cases we can be available to conduct job site visits and analysis. <br /> 4. Prepare correction lists. <br /> We will prepare a compete and legible list of corrections citing code references and including <br /> the name and phone number of the plan checker available to answer any of the applicant's <br /> questions. After each review, the list of corrections shall be sent(via mail, email or facsimile)to <br /> both the applicant and the Building Department. If required for clarifications or to expedite the <br /> plan review, items may be discussed by telephone directly with the applicant. Then the plans <br /> are in compliance, they shall be stamped "approved" on every page, signed and forwarded via <br /> UPS,or other carrier,to the City, at no extra charge. <br /> 5. Deliver approved plans. <br /> We will provide a courier service to deliver plans to the City,once they have been approved. <br /> 6. Maintain records of plans in process. <br /> 4LEAF, Inc. will maintain records of all plan checks conducted and will provide status reports <br /> either verbally, or in writing as required. <br /> 7. In the event of termination of any employee or sub-contractor, provide ongoing plan check <br /> services through completion on any one project. <br /> Through our plan check records system and our internal system of review and oversight, we <br /> maintain the ability to provide plan check continually that is not dependent on the availability of <br /> specific individuals. <br /> In order to provide the fastest turn around possible we do not assign people to specific jobs. The jobs <br /> are checked in the order received and the various disciplines are checked concurrently with as many as <br /> three people working on a project at a time. <br /> Inspection Services <br /> 4LEAF, Inc. offers inspection services. If requested we are able to provide inspection services based on <br /> the availability of our qualified field personnel. 4LEAF's inspection services include: <br /> •As-Needed Daily Inspections(on-call)3 Available upon request—24 hours or less <br /> • Part-Time Inspection Services(on-call)4 Available upon request—24 hours or less <br /> • Full-Time Inspection Services 4 Available upon request—48 hours or less <br /> • Project Inspectors 4 Available upon request—48 hours or less <br /> Consulting Services Agreement between [ 2014] <br /> City of San Leandro and 4 LEAF INC.—Exhibit A Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.