My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2014153467
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2014
>
Inst 2014153467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 9:31:36 AM
Creation date
8/6/2014 9:31:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/21/2014
Recorded Document Type
Development Agreement
Retention
PERM
Document Relationships
Ord 2014-002
(Approved by)
Path:
\City Clerk\City Council\Ordinances\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installation in Phase 1 or Phase 2 with the approval of the Community Development Director. <br /> Any costs in excess of 1%of the construction costs of Phase l and/or Phase 2 shall be considered <br /> a credit against the Public Art fund for subsequent phases. <br /> b. Developer must provide an attractive,prominent and visible <br /> freestanding art object, such as a large sculpture or fountain in each phase. Eligible expenses for <br /> the Public Art Fund include: art and artist selection process, site preparation, design, acquisition <br /> and/or construction of the art works. Developer shall have sole discretion in selection of the <br /> artist(s),the art piece or pieces, and the location of the art. Certain landscaping features, if <br /> appropriately designed and in consultation with an appropriate artist, may also be considered art <br /> under these provisions, including but not limited to water features, open space seating, Activity <br /> Area amenities, lighting and special paving installations. <br /> c. Developer is responsible for maintenance of all public art located <br /> on the Property. <br /> d. In lieu of funding on-site public art, Developer may fulfill all or a <br /> portion of its requirements under this Section 1.4.7 by making a payment calculated as one-half <br /> of one percent(0.5%) of the total construction budget to the City,to be deposited into a public <br /> art fund managed by the City, which will be used exclusively for eligible expenses consistent <br /> with the expenses set forth in Section 1.4.7(b) above. <br /> 1.4.10. Landscaping. Each phase of construction includes Developer's <br /> construction and maintenance of landscaping in conformity with Article 19, Landscape <br /> Requirements, of the San Leandro Zoning Code. City has the right to review and approve the <br /> landscaping plan prior to construction. <br /> 1.4.11. Maintenance. City and Developer will enter into a separate maintenance <br /> agreement that will set forth the requirements of Developer to maintain the Property, including <br /> but not limited to all landscaping, all buildings and the public art. <br /> 1.4.12. LEED Rating. Developer shall design each phase of improvements to <br /> achieve a minimum Silver LEED rating for commercial and mixed-use space and, if applicable, <br /> an equivalent Green Point Rating(from Build It Green) for residential space. <br /> 1.5. Downtown San Leandro Community Benefits District Following construction of <br /> the Project, Developer shall support the Downtown San Leandro Community Benefits District. <br /> II <br />
The URL can be used to link to this page
Your browser does not support the video tag.