Laserfiche WebLink
}C4'9Pon ATEt <br />BID SUMMARY <br />PROJECT TITLE: Hesperian.Springlake Rail Road Crossing Improvements <br />PROJECT NO.: 12-150-38-325 <br />BID NO.: 14-15.002 <br />This document is a summary of bids received for the subject project <br />and are provided only as a convenience. Listing of a particular bid is <br />not a finding that such bid has been found to be responsive or <br />accepted as complete by the City. An award of contract, if any, is <br />subject to approval of the City Council and/or the City Manager. <br />Contractors should refer to the contract documents for bidding <br />BID OPENING <br />DATE: Tuesday, August 12, 2014 <br />TIME: 3:00 p.m. <br />LOCATION: Council Conference Room <br />ENGINEER'S ESTIMATE <br />Date Approved: 7/10/2014 <br />Prepared by: Nicole Castelino <br />Columbia Electric, Inc. <br />1980 Davis Street <br />San Leandro, CA 94577 <br />Phone: (510) 430-9505 <br />Fax: (510) 430-1860 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />1 <br />Install curb and gutter per drawing 100 <br />200 LF <br />$70.00 <br />$14,000.00 <br />$68.50 <br />$13,700.00 <br />case 3101 including.2' tie in paving <br />2 <br />Install sidewalk per drawing 100 case <br />2,000 SF <br />$17.50 <br />$35,000.00 <br />$16.75 <br />$33,500.00 <br />3101 <br />3 <br />Install wheelchair ramp per drawing <br />750 SF <br />$20.50 <br />$15,375.00 <br />$21.00 <br />$15,750.00 <br />106A and B case 3101 including <br />truncated domes <br />4 <br />Traffic Control per Section 7-10.3 <br />1 LS <br />$25,000.00 <br />$25,000.00 <br />$500.00 <br />$500.00 <br />5 <br />Furnish and Install Sign W110 -11A <br />1 EA <br />$340.00 <br />$340.00 <br />$700.00 <br />$700.00 <br />mounted to (E) Street Light Pole <br />6 <br />Install Cast In Place domes per drawing <br />10 EA <br />$700.00 <br />$7,000.00 <br />$920.00 <br />$9,200.00 <br />106c and 106D case 3101 <br />7 <br />Install Vertical Curb per drawing 100 <br />80 LF <br />$70.00 <br />$5,600.00 <br />$67.50 <br />$5,400.00 <br />case 3101 including 2' tie in paving <br />8 <br />Install 4' Pedestrian Push Button Pole <br />2 EA <br />$1,250.00 <br />$2,500.00 <br />$2,855.00 <br />$5,710.00 <br />and Foundation per Drawing 500A and <br />500B Case 3101 <br />9 <br />Install 3" Conduit per Section Section <br />50 LF <br />$68.00 <br />$3,400.00 <br />$131.00 <br />$6,550.00 <br />306 <br />10 <br />Install City Provided APS System and <br />1 LS <br />$1,350.00 <br />$1,350.00 <br />$4,620.00 <br />$4,620.00 <br />Push Buttons per Section 307-4.10 <br />11 <br />Furnish and Install Signal Head <br />7 EA <br />$520.00 <br />$3,640.00 <br />$1,188.00 <br />$8,316.00 <br />mounting Bracket per Section 307-4.6 <br />12 <br />Install Stamped Colored Concrete per <br />50 SF <br />$60.00 <br />$3,000.00 <br />$75.00 <br />$3,750.00 <br />13 <br />Install Driveway per drawing 102 case <br />200 SF <br />$33.00 <br />$6,600.00 <br />$50.00 <br />$10,000.00 <br />14 <br />Striping per Section 310 <br />1 LS <br />$4,000.00 <br />$4,000.00 <br />$5,500.00 <br />$5,500.00 <br />15 <br />Furnish and Install ACpavement per <br />6 TON <br />$150.00 <br />$900.00 <br />$350.00 <br />$2,100.00 <br />Section 302-5 <br />Hesperian Springlake Rail Road Crossing Improvements 2nd Bid <br />Page 1 of 3 <br />Printed 8/12/2014 @ 4:19 PM <br />