My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2015 0126
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0126
>
2A Work Session 2015 0126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 9:59:45 AM
Creation date
1/21/2015 4:33:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/26/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0126 CSAmended+WS
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
PowerPoint 2A Work Session 2015 0126 Shoreline DEIR
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2022
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT DRAFT EIR <br />CITY OF SAN LEANDRO <br />EXECUTIVE SUMMARY <br />TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significance <br />Significance <br />Before <br />With <br />Significant Impact <br />Mitigation <br />Mitigation Measures <br />Mitigation <br />TRAF-2A: The proposed Project would cause the 1-880 <br />S <br />TRAF-2A: One of the following measures shall occur: <br />SU <br />northbound segment north of Davis Street to reduce from <br />■ Widen 1-880 to provide an additional travel lane in the <br />LOS E to LOS F in the PM peak hour under Year 2020 <br />northbound direction; or <br />conditions <br />■ Develop and implement a Transportation Demand Management <br />(TDM) plan that would discourage single occupant vehicle trips. <br />TDM measures may include: <br />■ Provide a shuttle service that operates between the Project <br />site and key locations such as San Leandro and Coliseum <br />BART stations and Oakland International Airport; <br />■ Facilitate carpool and ridesharing among residents of the <br />Project <br />TRAF-213: The proposed Project would cause the volume- <br />S <br />TRAF-2B.1: Widen Doolittle Drive to provide an additional travel lane <br />SU <br />to -capacity (v/c) ratio on the northbound segment of <br />in the northbound direction; or <br />Doolittle Drive, which would operate at Level of Service <br />TRAF-213.2: Provide a shuttle service that operates between the <br />(LOS) F, to increase by 0.06 under Year 2020 conditions <br />Project site and key locations such as San Leandro and Coliseum <br />and by 0.04 under Year 2035 conditions in the PM peak <br />BART stations and Oakland International Airport. <br />hour. <br />TRAF-2C: The proposed Project would cause increases in <br />S <br />TRAF-2C: Implement Mitigation Measures TRAF-1A through TRAF-7F. <br />LTS <br />delays at the Aurora Drive and Marina Boulevard (#10), <br />Any roundabouts shall be designed to accommodate AC Transit <br />Marina Boulevard and Merced Street (#12), Marina <br />busses. <br />Boulevard and 1-880 southbound off ramp (#14), and <br />Monarch Bay Drive and Mulford Point Drive (#19) <br />intersections, which would adversely impact the transit <br />operations of AC Transit Line S, 75 and 89. <br />TRAF-3. The proposed Project would not result in a <br />No Impact <br />N/A <br />N/A <br />change in air traffic patterns, including either an increase <br />in traffic levels or a change in location that results in <br />substantial safety risks. <br />TRAF-4A: The location of the proposed northern driveway <br />S <br />TRAF-4A: Remove the North Golf Course northern driveway from the <br />LTS <br />of the North Golf Course Residential component of the <br />Project plans. <br />Project presents a potential sight distance challenge for <br />cars Dulline out of the driveway. <br />LTS = Less Than Significant S = Significant SU = Significant Unavoidable Impact <br />1-40 DECEMBER 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.