My WebLink
|
Help
|
About
|
Sign Out
Home
2A Work Session 2015 0126
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0126
>
2A Work Session 2015 0126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 9:59:45 AM
Creation date
1/21/2015 4:33:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
1/26/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0126 CSAmended+WS
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
PowerPoint 2A Work Session 2015 0126 Shoreline DEIR
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0126
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2022
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT DRAFT EIR <br />CITY OF SAN LEANDRO <br />EXECUTIVE SUMMARY <br />TABLE 1-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Significance Significance <br />Before With <br />Significant Impact Mitigation Mitigation Measures Mitigation <br />peak hour, adding to the existing substandard LOS F in the TRAF-7C.2: Restripe lanes on the west leg to provide two SU <br />PM peak hour and cause the volume -to -capacity (v/c) corresponding receiving lanes. <br />ratio to increase by 0.07 under Near -Term Cumulative The lane geometries before and after implementation of these <br />Conditions. Mitigation Measures are shown in the figure opposite. <br />Before Mitigation Aft., MR1901on <br />18 1$ <br />b <br />1 � <br />TRAF-7D: The proposed Project would cause the level of S TRAF-7D: Optimize traffic signal cycle length at the intersection of LTS <br />service at the intersection of Aladdin Avenue and Aladdin Avenue and Alvarado Street. This signal does not operate in <br />Alvarado Street (#28) to reduce from LOS D to LOS E in coordination with any other signal; therefore, the cycle length can <br />the PM peak hour under Near -Term Cumulative be adjusted without affecting other signals in the system. <br />Conditions. <br />TRAF-7E: The proposed Project would cause the level of <br />S TRAF-7E: Implementation of Mitigation Measure TRAF-1C, installing LTS <br />service at the intersection of Aurora Drive and Marina <br />a mini -roundabout or a traffic signal, would lessen the near term <br />Boulevard (#10) to reduce from LOS A to LOS F in the AM <br />cumulative impacts to less than significant. The mini -roundabout <br />peak hour and from LOS B to LOS F in the PM peak hour <br />would improve the operations to LOS A in all three peak period <br />and from LOS B to LOS E in the Saturday peak hour. <br />hours. A traffic signal would improve the operation of the <br />intersection to LOS B in the AM peak hour and LOS A in the PM and <br />Saturday peak hours. <br />TRAF-7F: The proposed Project would cause the level of <br />S TRAF-7F: Implement Mitigation Measure TRAF-1D by installing a LTS <br />service at the intersection of Monarch Bay Drive and <br />roundabout. This would improve the operations to LOS A in the PM <br />Mulford Point Drive (#19) to reduce from LOS A to LOS F <br />peak hour. <br />in the PM peak hour. <br />TRAF-7G: The proposed Project would cause the <br />S TRAF-7G: Implement Mitigation Measures TRAF-1A.1 and TRAF-1A.2. LTS <br />intersection level of service of the intersection of Doolittle <br />Drive and Marina Boulevard (#11) to reduce from LOS D <br />to LOS F in the AM and PM peak hours <br />LTS = Less Than Significant S = Significant SU = Significant Unavoidable Impact <br />1-42 DECEMBER 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.