My WebLink
|
Help
|
About
|
Sign Out
Home
8Q Consent 2015 0217
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0217
>
8Q Consent 2015 0217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2015 9:12:24 AM
Creation date
2/11/2015 5:18:19 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/17/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0217 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0217
Reso 2015-032
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 15-004 <br />Applicable General Plan Policies <br />Policy 18.02-B: Pedestrian Safety Improvements: Develop programs to improve pedestrian <br />safety at both controlled and uncontrolled intersections throughout the City. Programs that <br />use innovative technology, such as lighted crosswalks and warning countdowns should be <br />explored. <br />Environmental Review <br />This project is categorically exempt from CEQA per section 15301, Existing Facilities. Repair <br />and maintenance of existing structures are covered by this section. <br />Summary of Public Outreach Efforts <br />This project was advertised in the Daily Review on July 18, 2014. Nearby residents and <br />businesses were informed of the project via door hangers at the start of construction. <br />Fiscal Impacts <br />A summary of the construction contract with Columbia Electric, Inc. is below: <br />Original Contract $236,936.50 <br />Change Orders $25,679.40 <br />Total Contract Amount $262,616.90 <br />The project cost was $345, 224.14, including design and construction administration. Union <br />Pacific Railroad's mandatory flagging during construction is estimated to be an additional <br />$15,000 for a final project cost of $368,904.00. <br />Budget Authority <br />This project was funded from two accounts: <br />• Section 130 Grant funds of $191,000 in account 150-38-325, which were appropriated <br />as part of the FY 2011-2012 budget and <br />• Measure B Bicycle and Pedestrian funds of $180,000 in account 144-36-325, which <br />were appropriated when the project was awarded in 2014. <br />PREPARED BY: Nicole Noronha Castelino, Associate Engineer, Engineering and <br />Transportation Department <br />City of San Leandro Page 2 Printed on 2111/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.