My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2015 0302
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0302
>
8E Consent 2015 0302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2015 9:24:09 AM
Creation date
2/25/2015 4:59:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/2/2015
Retention
PERM
Document Relationships
_CC Agenda 2015 0302 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0302
Reso 2015-058
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br /> �I <br /> Meeting Date: March 2, 2015 <br /> +tAtJ Staff Report <br /> File Number: 15-093 Agenda Section: CONSENT CALENDAR <br /> Agenda Number: 8.E. <br /> TO: City Council <br /> FROM: Chris Zapata <br /> City Manager <br /> BY: Keith Cooke <br /> Acting Engineering & Transportation Director <br /> FINANCE REVIEW: David Baum <br /> Finance Director <br /> TITLE: Staff Report for a Resolution Allocating Funds for the Thrasher Park Play <br /> Structure Replacement Project, Project No. 2006.0070; Allocating Funds for <br /> the Siempre Verde Park Rehabilitation Project, Project No. 2015.0270; and <br /> Approving a Consulting Services Agreement with Harris Design <br /> SUMMARY AND RECOMMENDATIONS <br /> Staff recommends allocation of$65,000 of Park Development Fee funding for: (1) the <br /> Thrasher Park Play Structure Replacement Project; and (2) $1,538,000 of Park Development <br /> Fees and $1,145,594 of General Fund towards the design and construction of the Siempre <br /> Verde Park Rehabilitation Project. Staff also recommends the approval of a Consulting <br /> Services Agreement with Harris Design in the amount of$212,235 for the preparation of <br /> plans, specifications and cost estimates related to the rehabilitation of Siempre Verde Park. <br /> BACKGROUND <br /> The City received a grant from the State of California Department of Housing and Community <br /> Development (HCD) in December 2014 for construction of improvements at three locations <br /> that included West Joaquin Plaza, Thrasher Park and Siempre Verde Park. The grant funds <br /> are only available for construction costs; and staff and consultant costs related to design, <br /> bidding, and construction oversight are not eligible for reimbursement. The HCD Grant <br /> requires that the funds must be expended by June 30, 2016 and therefore expediency in <br /> approval actions is needed for project success. <br /> Proposed improvements to Thrasher Park include replacement of outdated play equipment <br /> and installation of a new ball park safety fence to reduce the number of foul balls leaving the <br /> field and entering the play area, as well as installation of an ADA-compliant access ramp into <br /> the play area, providing a van-accessible parking stall, and replacing the play area safety <br /> surfacing. <br /> Proposed improvements to Siempre Verde Park involve the complete reconstruction of the <br /> City of San Leandro Page 1 Printed on 2124/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.