My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2015 0316
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0316
>
8I Consent 2015 0316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2015 12:25:52 PM
Creation date
3/11/2015 5:16:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/16/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0316 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0316
Reso 2015-066
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1275 Hwy 23 NW, Suite 101 <br /> Suwanee, Georgia 30024 <br /> 678.730.1950 <br /> <br />SmartWAVE Confidential Page 4 <br />Manufacturer Support Options <br /> <br />Payment Terms and Assumptions <br />SmartWave made the following assumptions regarding this proposal: <br /> All invoices are due Net-30 upon receipt of an invoice. <br /> Pricing assumes that all City owned street lights, traffic signals and buildings can be used for AP <br />mounting locations. <br /> The City of San Leandro is responsible for extending fiber to the Pelton Plaza sign location . All <br />other locations will mesh to the Pelton Plaza sign location. <br /> The City of San Leandro will provide a single point of contact with authority to make decisions <br />on behalf of the Installation Project. <br /> Preliminary design is based on initial propagation models and subject to change upon <br />completion of a site survey and spectrum sweep. <br /> Preliminary design assumes access to mounting assets as identified. If owners do not allow <br />access, coverage areas and costs could be impacted. <br /> Material list and quantities are subject to change upon completion of an active site survey. <br /> Design assumes that adequate power at AP mounting locations. <br /> Design assumes the City will provide Internet services to Gateway radio locations. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.