Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Annual Street Sealing 2014-15 <br />PROJECT NO.: 2015.007 <br />BID NO.'. 14-15.022 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />American Asphalt <br />VSS International, Inc. <br />DATE: Thursday, March 5, 2015 <br />Date Approved: <br />2/4/2015 <br />24200 Clawiter Road <br />3785 Channel Drive <br />TIME: 3:00 p.m. <br />Prepared by: <br />N. Castelino <br />Hayward, CA 94545 <br />West Sacramento, CA 95691 <br />LOCATION: City Clerk's Office <br />Phone: (510) 723-0280 <br />Phone: (916) 373-1500 <br />Fax: (510) 723-0288 <br />Fax: (916) 373-0183 <br />ITEM <br />NO. <br />ITEM <br />QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />15 <br />Preformed Green Thermoplastic Panels with Bike <br />3 EA <br />$500.00 <br />$1,500.00 <br />$650.00 <br />$1,950.00 <br />$682.00 <br />$2,046.00 <br />Lane Arrow <br />TOTAL BASE BID: <br />$822,745.20 <br />$808,182.42 <br />$944,001.25 <br />BID ALTERNATE A <br />Al <br />Failed Existing AC <br />1560 TONS <br />$200.00 <br />$312,000.00 <br />$232.00 <br />$361,920.00 <br />$167.75 <br />$261,690.00 <br />Pavement Repairs <br />(Dig Outs) <br />A2 <br />Traffic Control & Construction Area Signs, Lane <br />1 LS <br />$46,800.00 <br />$46,800.00 <br />$5,000.00 <br />$5,000.00 <br />$5,310.00 <br />$5,310.00 <br />Closures, and Detours per Sections 215 & 315 <br />TOTAL BID ALTERNATE A: <br />$358,800.00 <br />$366,920.00 <br />$267,000.00 <br />TOTAL BASE BID: <br />$822,745.20 <br />$808,182.42 <br />$944,001.25 <br />TOTAL BASE BID + ALTERNATE BID ITEM A: <br />$1,181,545.20 <br />$1,175,102.42 <br />$1,211,001.25 <br />SUBCONTRACTORS: <br />Chrisp Company <br />Chrisp Company <br />American Pavement Systems <br />Central Valley Engineering & Asphalt, Inc. <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />** Math Error Corrected and <br />** Math Error Correcte and Addendum #1 <br />Addendum #1 Received <br />Received <br />NOTES: <br />Reviewed by: Date: <br />Nicole C telino, Project Manager <br />Reviewed by: //,—� 11 Date: <br />Nic Thom, Senior Engineer <br />Annual Street Sealing 2014-15 Page 2 of 6 Printed 3/6/2015 @ 1:41 PM <br />