Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Annual Street Sealing 2014-15 <br />PROJECT NO.: 2015.007 <br />BID NO.: 14-15.022 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Sierra nevada Construction, Inc. <br />Intermountain Slurry Seal, Inc. <br />DATE: Thursday, March 5, 2015 <br />Date Approved: 2/4/2015 <br />P.O. Box 50760 <br />1005 Terminal Way, Suite 220 <br />TIME: 3:00 p.m. <br />Prepared by: N. Castelino <br />Sparks, NV 89435 <br />Reno, NV 89502 <br />LOCATION: City Clerk's Office <br />Phone: (775) 355-0420 <br />Phone: (775) 358-1355 <br />Fax: (775) 355-0535 <br />Fax: (775) 355-3458 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />BASE BID <br />1 <br />Traffic Control & Construction Area Signs, Lane <br />1 LS <br />$64,823.45 <br />$64,823.45 <br />$118,148.70 <br />$118,148.70 <br />$451,060.75 <br />$451,060.75 <br />Closures, and Detours per Sections 215 & 315 <br />2 <br />Construction Staging/Stockpile Location per Section <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$11,000.00 <br />$11,000.00 <br />$12,500.00 <br />$12,500.00 <br />7-10.2.1 <br />3 <br />Emulsion Aggregate Slurry (Final Quantity) per <br />132325 SY <br />$2.00 <br />$264,650.00 <br />$2.40 <br />_ $317,580.00 <br />$1.70 <br />$224,952.50 <br />Sections 203-5 & 302-4 <br />4 <br />Asphalt Rubber Chip Seal (Final Quantity) per <br />66255 SY <br />$4.25 <br />$281,583.75 <br />$4.28 <br />$283,571.40 <br />$4.25 <br />$281,583.75 <br />Sections 203-12 & 302-10 <br />5 <br />Microsurfacing (Final Quantity) per Sections 203-16 & <br />24438 SY <br />$3.00 <br />$73,314.00 <br />$3.55 <br />$86,754.90 <br />$2.30 <br />$56,207.40 <br />302-14 <br />6 <br />Remove and Replace Existing Thermoplastic Stripes, <br />1 LS <br />$116,000.00 <br />$116,000.00 <br />$165,000.00 <br />$165,000.00 <br />$121,600.00 <br />$121,600.00 <br />Pavement Markings and Markers per Sections 210, <br />214, 310 & 312 <br />7 <br />10' Unistrut Sign Post <br />4 EA <br />$160.00 <br />$640.00 <br />$272.00 <br />$1,088.00 <br />$200.00 <br />$800.00 <br />8 <br />Sign Post Anchor <br />4 EA <br />$55.00 <br />$220.00 <br />$136:00 <br />$544.00 <br />$100.00 <br />$400.00 <br />9 <br />Furnish and Install M6-6 (RT) Sign <br />1 EA <br />$130.00 <br />$130.00 <br />$136.00 <br />$136.00 <br />$100.00 <br />$100.00 <br />10 <br />Furnish and Install M6-4 Sign <br />1 EA <br />$130.00 <br />$130.00 <br />$136.00 <br />$136.00 <br />$100.00 <br />$100.00 <br />11 <br />Furnish and Install R81 (CA) Sign <br />6 EA <br />$130.00 <br />$780.00 <br />$136.00 <br />$816.00 <br />$100.00 <br />$600.00 <br />12 <br />Furnish and Install D11-1 Sign <br />1 EA <br />$130.00 <br />$130.00 <br />$136.00 <br />$136.00 <br />$100.00 <br />$1001.00 <br />13 <br />Preformed Green Thermoplastic for Bike Lanes <br />612 SF <br />$12.00 <br />$7,344.00 <br />$17.00 <br />$10,404.00 <br />$12.00 <br />$7,344.00 <br />14 <br />Preformed Green Thermoplastic Panels with Bike <br />3 EA <br />$500.00 <br />$1,500.00 <br />$2,040.00 <br />$6,120.00 <br />$1,500.00 <br />$4,500.00 <br />Rider Symbol <br />Annual Street Sealing 2014-15 Page 3 of 6 Printed 3/6/2015 @ 1:41 PM <br />