Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Annual Street Sealing 2014-15 <br />PROJECT NO.: 2015.007 <br />Rin Nn • 1a-1r,_n22 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Sierra nevada Construction, Inc. <br />Intermountain Slurry Seal, Inc. <br />DATE: Thursday, March 5, 2015 <br />Date Approved: <br />2/4/2015 <br />P.O. Box 50760 <br />1005 Terminal Way, Suite 220 <br />TIME: 3:00 p.m. <br />Prepared by: <br />N. Castelino <br />Sparks, NV 89435 <br />Reno, NV 89502 <br />LOCATION: City Clerk's Office <br />Phone: (775) 355-0420 <br />Phone: (775) 358-1355 <br />Fax: (775) 355-0535 <br />Fax: (775) 355 3458 <br />ITEM <br />NO. <br />ITEM <br />QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />15 <br />Preformed Green Thermoplastic Panels with Bike <br />3 EA <br />$500.00 <br />$1,500.00 <br />$884.00 <br />$2,652.00 <br />$650.00 <br />$1,950.00 <br />Lane Arrow <br />TOTAL BASE BID: <br />$822,745.20 <br />$1,004,087.00 <br />$1,163,798.40 <br />BID ALTERNATE A <br />Al <br />Failed Existing AC <br />1560 TONS <br />$200.00 <br />$312,000.00 <br />$157.00 <br />$244,920.00 <br />$159.76 <br />$249,225.60 <br />Pavement Repairs <br />(Dig Outs) <br />A2 <br />Traffic Control & Construction Area Signs, Lane <br />1 LS <br />$46,800.00 <br />$46,800.00 <br />$6,000.00 <br />$6,000.00 <br />$7,000.00 <br />$7,000.00 <br />Closures, and Detours per Sections 215 & 315 <br />TOTAL BID ALTERNATE A: <br />$358,800.00 <br />$250,920.00 <br />$256,225.60 <br />TOTAL BASE BID: <br />$822,745.20 <br />$1,004,087.00 <br />$1,163,798.40 <br />TOTAL BASE BID + ALTERNATE BID ITEM A: <br />$1,181,545.20 <br />$1,255,007.00 <br />$1,420,024.00 <br />SUBCONTRACTORS: <br />American Pavement Systems <br />Chrisp Company <br />Chrisp Company <br />Central Valley Engineering & Asphalt, Inc. <br />O'Grady Paving <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />** Addendum #1 Received <br />** Addendum #1 Received <br />NOTES: <br />Reviewed by: Date: <br />Nicole C telino, Project Manager <br />Reviewed by: Date: 3 6 ! 5 <br />Nick I <br />hom, Senior Engineer <br />Annual Street Sealing 2014-15 Page 4 of 6 Printed 3/6/2015 @ 1:41 PM <br />