Laserfiche WebLink
BID SUMMARY <br />PROJECT TITLE: Sanitary Sewer Line Replacement/Repair 2012-13 <br />PROJECT NO.: 2013.0120 <br />BID NO.: 14-15.025 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Con -Quest Contractors, Inc. <br />Ranger Pipelines Incorporated <br />DATE: Monday, March 23, 2015 <br />Date Approved: 2/25/2015 <br />1700 Neptune Drive <br />P.O. Box 24109 <br />TIME: 3:00 p.m. <br />Prepared by: Kyle Lei <br />San Leandro, CA 94577 <br />San Francisco, CA 94124 <br />LOCATION: City Clerk's Office <br />Phone: (510) 957-1845 <br />Phone: (415) 822-3700 <br />Fax: (510) 957-1870 <br />Fax: (415) 822-3703 <br />ITEM <br />NO. <br />ITEM QUANTITY <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />57 <br />Raise Nine Oro Loma Manhole Frame <br />1 LS <br />$9,000.00 <br />$9,000.00 <br />$8,325.00 <br />$8,325.00 <br />$11,250.00 <br />$11,250.00 <br />and Covers Listed on Appendix A to <br />Adjacent Grade per City Standard Plan <br />No. 222 <br />TOTAL BASE BID: $642,347.50 <br />$844,589.00 <br />$940,271.00 <br />ADDITIVE BID ITEM A <br />Al <br />Mobilization / Demobilization <br />1 LS <br />$10,000.00 <br />$10,000.00 <br />$30,000.00 <br />$30,000.00 <br />$10,000.00 <br />$10,000.00 <br />A2 <br />NOT USED <br />0 SEG <br />$200.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A3 <br />Traffic Control Level 2 <br />14 SEG <br />$600.00 <br />$8,400.00 <br />$650.00 <br />$9,100.00 <br />$1,000.00 <br />$14,000.00 <br />A4 <br />Traffic Control Level 3 <br />1 SEG <br />$1,000.00 <br />$1,000.00 <br />$1,000.00 <br />$1,000.00 <br />$1,500.00 <br />$1,500.00 <br />A5 <br />Traffic Control Level 4 <br />3 SEG <br />$1,400.00 <br />$4,200.00 <br />$1,250.00 <br />$3,750.00 <br />$2,000.00 <br />$6,000.00 <br />A6 <br />Excavation & Backfill, < 5.0' Deep <br />96 LF <br />$110.00 <br />$10,560.00 <br />$220.00 <br />$21,120.00 <br />$300.00 <br />$28,800.00 <br />A7 <br />Excavation & Backfill, 5.0' to 7.9' Deep <br />273 LF <br />$125.00 <br />$34,125.00 <br />$270.00 <br />$73,710.00 <br />$450.00 <br />$122,850.00 <br />A8 <br />Excavation & Backfill, 8.0' to 10.9' <br />45 LF <br />$140.00 <br />$6,300.00 <br />$325.00 <br />$14,625.00 <br />$500.00 <br />$22,500.00 <br />Deep <br />A9 <br />NOT USED <br />0 LF <br />$160.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A10 <br />NOT USED <br />0 LF <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />All <br />NOT USED <br />0 LF <br />$450.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Al2 <br />NOT USED <br />0 LF <br />$500.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A13 <br />NOT USED <br />0 LF <br />$500.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A14 <br />NOT USED <br />0 LF <br />$900.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A15 <br />6 -inch VCP Replacement <br />31 LF <br />$28.00 <br />$868.00 <br />$20.00 <br />$620.00 <br />$30.00 <br />$930.00 <br />A16 <br />8 -inch VCP Replacement <br />39 LF <br />$32.00 <br />$1,248.00 <br />$23.00 <br />$897.00 <br />$35.00 <br />$1,365.00 <br />A17 <br />NOT USED <br />0 LF <br />$45.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A18 <br />NOT USED <br />0 LF <br />$200.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A19 <br />6 -inch PVC (C900) Pipeline Installation <br />89 LF <br />$20.00 <br />$1,780.00 <br />$19.00 <br />$1,691.00 <br />$30.00 <br />$2,670.00 <br />A20 <br />8 -inch PVC (C900) Pipeline Installation <br />232 LF <br />$30.00 <br />$6,960.00 <br />$23.00 <br />$5,336.00 <br />$35.00 <br />$8,120.00 <br />A21 <br />NOT USED <br />0 LF <br />$45.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A22 <br />NOT USED <br />0 LF <br />$50.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />A23 <br />Sewer Lateral Reconnection <br />11 EA <br />$500.00 <br />$5,500.00 <br />$500.00 <br />$5,500.00 <br />$1,000.00 <br />$11,000.00 <br />Sanitary Sewer Line Replacement - Repair 2012-13 Page 4 of 6 Printed 3/24/2015 @ 8:10 AM <br />