BID SUMMARY
<br />PROJECT TITLE: Sanitary Sewer Line Replacement/Repair 2012-13
<br />PROJECT NO.: 2013.0120
<br />BID NO.: 14-15.025
<br />BID OPENING
<br />ENGINEER'S ESTIMATE
<br />Con -Quest Contractors, Inc.
<br />Ranger Pipelines Incorporated
<br />DATE: Monday, March 23, 2015
<br />Date Approved: 2/25/2015
<br />1700 Neptune Drive
<br />P.O. Box 24109
<br />TIME: 3:00 p.m.
<br />Prepared by: Kyle Lei
<br />San Leandro, CA 94577
<br />San Francisco, CA 94124
<br />LOCATION: City Clerk's Office
<br />Phone: (510) 957-1845
<br />Phone: (415) 822-3700
<br />Fax: (510) 957-1870
<br />Fax: (415) 822-3703
<br />ITEM
<br />NO.
<br />ITEM QUANTITY
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />57
<br />Raise Nine Oro Loma Manhole Frame
<br />1 LS
<br />$9,000.00
<br />$9,000.00
<br />$8,325.00
<br />$8,325.00
<br />$11,250.00
<br />$11,250.00
<br />and Covers Listed on Appendix A to
<br />Adjacent Grade per City Standard Plan
<br />No. 222
<br />TOTAL BASE BID: $642,347.50
<br />$844,589.00
<br />$940,271.00
<br />ADDITIVE BID ITEM A
<br />Al
<br />Mobilization / Demobilization
<br />1 LS
<br />$10,000.00
<br />$10,000.00
<br />$30,000.00
<br />$30,000.00
<br />$10,000.00
<br />$10,000.00
<br />A2
<br />NOT USED
<br />0 SEG
<br />$200.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A3
<br />Traffic Control Level 2
<br />14 SEG
<br />$600.00
<br />$8,400.00
<br />$650.00
<br />$9,100.00
<br />$1,000.00
<br />$14,000.00
<br />A4
<br />Traffic Control Level 3
<br />1 SEG
<br />$1,000.00
<br />$1,000.00
<br />$1,000.00
<br />$1,000.00
<br />$1,500.00
<br />$1,500.00
<br />A5
<br />Traffic Control Level 4
<br />3 SEG
<br />$1,400.00
<br />$4,200.00
<br />$1,250.00
<br />$3,750.00
<br />$2,000.00
<br />$6,000.00
<br />A6
<br />Excavation & Backfill, < 5.0' Deep
<br />96 LF
<br />$110.00
<br />$10,560.00
<br />$220.00
<br />$21,120.00
<br />$300.00
<br />$28,800.00
<br />A7
<br />Excavation & Backfill, 5.0' to 7.9' Deep
<br />273 LF
<br />$125.00
<br />$34,125.00
<br />$270.00
<br />$73,710.00
<br />$450.00
<br />$122,850.00
<br />A8
<br />Excavation & Backfill, 8.0' to 10.9'
<br />45 LF
<br />$140.00
<br />$6,300.00
<br />$325.00
<br />$14,625.00
<br />$500.00
<br />$22,500.00
<br />Deep
<br />A9
<br />NOT USED
<br />0 LF
<br />$160.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A10
<br />NOT USED
<br />0 LF
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />All
<br />NOT USED
<br />0 LF
<br />$450.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />Al2
<br />NOT USED
<br />0 LF
<br />$500.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A13
<br />NOT USED
<br />0 LF
<br />$500.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A14
<br />NOT USED
<br />0 LF
<br />$900.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A15
<br />6 -inch VCP Replacement
<br />31 LF
<br />$28.00
<br />$868.00
<br />$20.00
<br />$620.00
<br />$30.00
<br />$930.00
<br />A16
<br />8 -inch VCP Replacement
<br />39 LF
<br />$32.00
<br />$1,248.00
<br />$23.00
<br />$897.00
<br />$35.00
<br />$1,365.00
<br />A17
<br />NOT USED
<br />0 LF
<br />$45.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A18
<br />NOT USED
<br />0 LF
<br />$200.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A19
<br />6 -inch PVC (C900) Pipeline Installation
<br />89 LF
<br />$20.00
<br />$1,780.00
<br />$19.00
<br />$1,691.00
<br />$30.00
<br />$2,670.00
<br />A20
<br />8 -inch PVC (C900) Pipeline Installation
<br />232 LF
<br />$30.00
<br />$6,960.00
<br />$23.00
<br />$5,336.00
<br />$35.00
<br />$8,120.00
<br />A21
<br />NOT USED
<br />0 LF
<br />$45.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A22
<br />NOT USED
<br />0 LF
<br />$50.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />A23
<br />Sewer Lateral Reconnection
<br />11 EA
<br />$500.00
<br />$5,500.00
<br />$500.00
<br />$5,500.00
<br />$1,000.00
<br />$11,000.00
<br />Sanitary Sewer Line Replacement - Repair 2012-13 Page 4 of 6 Printed 3/24/2015 @ 8:10 AM