My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2015-081
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2015
>
Reso 2015-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2015 11:40:00 AM
Creation date
4/27/2015 11:39:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
4/20/2015
Retention
PERM
Document Relationships
8C Consent 2015 0420
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER'S COST OPINION <br /> FOR <br /> West Juana Pedestrian Improvements <br /> Project Number 2014.0500 <br /> UNIT <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE AMOUNT <br /> 1 Mobilization 1 LS $15,000.00 $15,000.00 <br /> 2 Traffic Control 1 LS $6,000.00 $6,000.00 <br /> 3 Clear and Grub incl concrete,AC, and sawcut 1 LS $60,000.00 $60,000.00 <br /> 4 AC pavement(no demo) 538 ton $200.00 $107,600.00 <br /> 5 Fog seal at removed striping 1 LS $8,000.00 $8,000.00 <br /> 6 Adjust utility boxes to grade 8 EA $200.00 $1,600.00 <br /> 7 12" SD pipe 194 LF $220.00 $42,680.00 <br /> 8 New LP fdn and relocate E poles,wired 2 EA $4,000.00 $8,000.00 <br /> 9 R&R striping 1 LS $8,000.00 $8,000.00 <br /> 10 Duratherm AC imprint 4,430 SF $3.00 $13,290.00 <br /> 11 sidewalk incl AB (no demo) 7,566 SF $11.00 $83,226.00 <br /> 12 curb and gutter(w/o2'AC tie in and no demo) 652 LF $45.00 $29,340.00 <br /> 13 commercial driveway incl AB (no demo) 60 SF $13.00 $780.00 <br /> 14 ADA ramps incl AB (no demo) 1,369 SF $13.00 $17,797.00 <br /> 15 New sign poles and reinstall E signs 6 EA $300.00 $1,800.00 <br /> 16 Curb inlet 8 EA $3,500.00 $28,000.00 <br /> 17 Furnish and install tree grate 1 EA $2,500.00 $2,500.00 <br /> 18 County SDMH 6 EA $6,000.00 $36,000.00 <br /> 19 Pothole utilities 3 EA $800.00 $2,400.00 <br /> 20 Trash Capture Screens 8 EA $600.00 $4,800.00 <br /> 21 Sheeting, Shoring,and Bracing 1 LS $2,000.00 $2,000.00 <br /> 22 Temporary Pedestrian facilities at Carpentier 1 LS $15,000.00 $15,000.00 <br /> 23 Furnish and install street lights 6 EA $8,000.00 $48,000.00 <br /> SUBTOTAL CONSTRUCTION $541,813.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.