|
Current Fee Proposed FeeReferenceDescription Proposed Fee Explanations
<br />F. Dry Storage Rate $75.00 per space per month
<br />PUBLIC WORKS SERVICES DEPARTMENT – Environmental Services Section Method
<br />1 Hazardous Materials Storage SLMC 3-3-300
<br />Quantity Range 1 $ 110.00 (2) $113 2.8% CPI rounded to nearest dollar for all ESS fees
<br />Quantity Range 2 $220.00 $226
<br />Quantity Range 3 $317.00 $326
<br />Quantity Range 4 $415.00 $427
<br />Quantity Range 5 $519.00 $533
<br />B. Annual Fees for Storage of Radioactive Materials (1)$153.00 $157
<br />C. Aboveground Tank Installation Permit (3)
<br />· First Tank $808.00 $830
<br />· Each Additional $269.00 $277
<br />D. APSA Facility Annual Fee
<br /> Qualified Facility (Tier I/Tier II)$135.00 $138
<br /> Non-Qualified Facility (full SPCC)$237.00 $244
<br />2 Accidental Release Program Review of RMP by:SLMC 3-3-300
<br /> City Staff $135.00/hour $138
<br /> Outside consultant Direct Costs plus 10%
<br /> Annual Fee:
<br /> Program 1 $525.00 $539
<br /> Program 2 $682.00 $701
<br /> Program 3 $887.00 $912
<br />3 Underground Hazardous Materials Storage SLMC 3-3-300
<br />A. Annual Operating Permit (4): Each Tank $115.00 $118
<br />B. New Tank Installation (5)
<br />· First Tank $2,423.00 $2,491
<br />· Each Additional $269.00 $277
<br />C. Tank Removal, Repair, Alterations (6)
<br />· First Tank $1,346.00 $1,384
<br /> Each Additional $215.00 $221
<br />D. Minor Repairs and Alterations Hourly Rate $135.00/hour $138
<br />4 Contaminated Site Cleanup Program:
<br /> Oversight of Remedial Investigations and Actions:
<br />· City Staff Hourly Rate $135.00/hour $138
<br />· Outside Consultant Direct Costs plus 10%
<br />5 Hazardous Waste On-site Treatment:CA Health & Safety Code; Title 27
<br /> Annual Fees (4):
<br />· Permit-by-Rule $1,002.00 $1,030
<br />· Conditional Authorization $428.00 $439
<br />· Conditional Exempt $116.00 $119
<br />(1)
<br />(2)Quantity Range 1 Less than or equal to 500 pounds, 55 gallons, or 2,000 cubic feet at STP.
<br />Quantity Range 2 Greater than 500 pounds, 55 gallons, or 2,000 cubic feet at STP, but less than or equal to 5,000 pounds, 550 gallons or 20,000 cubic feet at STP, respectively.
<br />Quantity Range 3 Greater than 5,000 pounds, 550 gallons, or 20,000 cubic feet at STP, but less than or equal to 50,000 pounds, 5,500 gallons or 200,000 cubic feet at STP, respectively.
<br />Quantity Range 4 Greater than 50,000 pounds, 5,500 gallons, or 200,000 cubic feet at STP, but less than or equal to 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP, respectively.
<br />Quantity Range 5 Greater than 500,000 pounds, 55,000 gallons, or 2,000,000 cubic feet at STP.
<br />(3)
<br />(4)
<br />(5)Includes plan review, field inspections, and permit processing. Additional time will be charged at the current hourly rate.
<br />A. Annual fees for storage of combustible liquids, corrosives, flammable gases,
<br />flammable liquids, flammable solids, nonflammable gases, organic peroxides,
<br />other regulated materials, oxidizers, poisonous gasses, poisonous materials (1)
<br />
<br />Includes permit processing and two inspections annually (one annual and one re-inspection) for compliance with the Uniform Fire Code, review of the HMBP, and review of all emergency response plans
<br />Includes permit processing and two inspections annually (one annual and one re-inspection) for compliance with applicable federal and state underground tank and/or hazardous waste laws and regulations and/or the Uniform Fire
<br />Code. Additional inspections will be charged at the current hourly rate.
<br />Includes plan review, field inspections, and permit processing. Time for inspections is two hours for the first tank and one hour each additional tank. Additional inspections will be charged at the current hourly rate.
<br /> 26
|