My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearing 2015 0504
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0504
>
4A Public Hearing 2015 0504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2015 1:34:37 PM
Creation date
4/29/2015 9:39:23 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/4/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0504 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0504
PowerPoint 4A&4B Public Hearing 2015 0504 Fees
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0504
Reso 2015-088
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Current Fee Proposed FeeReferenceDescription Proposed Fee Explanations <br />(6)Includes plan review, field inspections, and permit processing. Additional time will be charged at the current hourly rate. <br />PUBLIC WORKS SERVICES DEPARTMENT – Environmental Services Section (continued) Method <br />6 Hazardous Waste Generators CA Health & Safety Code; Title 27 <br />$153.00 - CESQG (7)$157 2.8% CPI rounded to nearest dollar for all ESS fees <br />$306.00 - SQG (7)$314 <br />$551.00 - LQG (7)$566 <br />$153.00 - UWG (7)$157 <br />$76.00 - CESQG 0 (7)$79 <br />7 CAL-EPA CUPA Surcharge Fee As required by State of California <br />8 Hazardous Materials File Review :SLAC 6.4.100 <br />A. Photocopying See City-Wide <br />B. Copies of Site Lists $12.00/list $12 <br />9 Late Payment Charges .75% of outstanding balance per month for <br />accounts delinquent 30 days or more. <br />SLAC 6.4.100 <br /> <br />10 Plan Review :SLMC 3-3-100 <br />A. City Staff Hourly Rate $135.00/hr.$138 <br />B. Outside Contractor Direct Costs plus + 10% <br />C. Recycling Program 135.00/hr $138 <br />11 Wastewater Pretreatment: <br />A. All Users SLMC 3-15-510 <br />Service Charge – Per Connection SLAC 12.5.110(e) <br />-- Weekly Connection Activity $1,572.00 per month $1,616 <br />-- Semi-Monthly Activity $786.00 per month $808 <br />-- Monthly Activity $393.00 per month $404 <br />-- Bi-Monthly Activity $197.00 per month $202 <br />-- Quarterly Activity $131.00 per month $135 <br />-- Semi-Annual Activity $ 66.00 per month $67 <br />-- Annual Activity $ 33.00 per month $34 <br />-- Biennial Activity $ 16.00 per month $17 <br />B. Service Users <br />Sampling Charge and Routine Analysis – Per Sample <br />-- Composite Samples $947.00 $947 <br />-- Grab Samples $374.00 $374 <br />-- Other Analyses Cost + 10% <br />Permit Fee (Five Year)$1,307.00 $1,343 <br />C. Compliance Users: <br />Sampling Charge – Per Sample <br />-- Composite Samples $867.00 $867 <br />-- Grab Samples $337.00 $337 <br />Lab Analysis Cost + 10% <br />Permit Fee (Triennial)$784.00 $806 <br />D. Violation Follow-Up: <br />-- Composite Samples $1,337.00 $1,337 <br />-- Grab Samples $912.00 $912 <br />-- Other Analyses Cost + 10% <br />E. Special Discharge Permit (Annual)$784.00 $806 <br />12 Miscellaneous Services : <br /> A. Site Visits (No Sampling)$269.00 $269 <br /> B. City Staff $135.00 per hour $138 <br />C. Pollution Prevention Permit (8)$201.00 per year SLMC 3-14-520 $207 <br /> D. Facility Stormwater Inspection Fee $174.00 $179 <br />(4) <br />(7)CESQG – Conditionally Exempt Small Quantity Generator – less than 100 kilograms of hazardous waste per month. <br />SQG – Small Quantity Generator – more than or equal to 100 kilograms but less than 1,000 kilograms of hazardous waste per month. <br />LQG – Large Quantity Generator – more than or equal to 1,000 kilograms of hazardous waste per month <br />UWG – Universal Waste Generator <br />CESQG 0 – Zero waste count due to onsite treatment and/or recycling resulting in off-site shipment not counted as hazardous waste. <br />A. Annual Fees for Generators of Hazardous Waste (4) <br />CA Health & Safety Code; Title 27 <br />Includes permit processing and two inspections annually (one annual and one reinspection) for compliance with applicable federal and state underground tank and/or hazardous waste laws and regulations and/or the Uniform Fire <br />Code. Additional inspections will be charged at the current hourly rate. <br /> 27
The URL can be used to link to this page
Your browser does not support the video tag.