My WebLink
|
Help
|
About
|
Sign Out
Home
8H Consent 2015 0518
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0518
>
8H Consent 2015 0518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:28:03 AM
Creation date
5/13/2015 9:27:37 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/18/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0518 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0518
Reso 2015-094
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Invoices shall be prepared by the listing of street names, side of street (North, East, West, South <br />), what block to what block, and total number of trees trimmed on that side of the specified street <br />in between each block. <br />g. WEEKLY MEETINGS: Contractor shall be required to meet weekly with the Tree Supervisor or <br />his representative to confirm the work completed, discuss any issues that may have occurred, <br />and to review the contractor's proposed work schedule. <br />10. CLEANUP: All branches, brush, leaves, chips, and sawdust are to be removed from the site and <br />properly disposed of by the Contractor as part of the bid price. The intent is that all areas are to <br />be left in as clean a condition or better than before the Contractor's operations. Cleanup is to be <br />done continuously as each tree is finished. No brush is to be left at any of the tree sites. <br />11. TRAFFIC CONTROL AND ACCESS: Contractor shall not completely obstruct public pedestrian <br />pathways or deny access to private property at any time. No streets shall be closed at any time. <br />The Contractor may establish "No Parking" zones, contiguous to the work area by posting signs. <br />The City will enforce parking restrictions only when the Contractor has posted the proper signs <br />and has notified the City Police Department a minimum of 48 hours in advance of the required <br />restriction period. <br />Construction signs, lights, barricades, etc., shall conform to the latest revision of the Manual of <br />Warning Signs, Lights and Devices for Use in Performance of Work Upon Highways, by California <br />Department of Transportation. <br />12. CORRECTION OF HAZARDOUS CONDITIONS: If, in the determination of the city Supervisor, <br />any work done or omitted by the Contractor or any act of vandalism or theft has created a <br />condition hazardous to the public, the city Supervisor will notify the Contractor's office by <br />telephone. The Contractor shall commence correction of such condition by placement of <br />barricades or as otherwise directed by the city within one (1) hour of receipt of such notice at his <br />office, and shall complete correction thereof on the same calendar day, regardless of the size of <br />the working force required or the number of hours of work required. <br />If the contractor cannot be reached by telephone, or fails to respond to the hazardous condition <br />within the specified one (1) hour limit, the city shall have the authority to cause said hazardous <br />condition to be corrected and deduct the cost thereof from any amounts due or to become due <br />the Contractor. Such costs shall include any minimum or base costs for labor, materials or <br />equipment as required by contracts, agreements or supplier but in no case shall such cost be less <br />than $250 per hazardous condition per location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.