My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2015 0518
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2015
>
Packet 2015 0518
>
10A Action 2015 0518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 7:58:41 AM
Creation date
5/13/2015 9:41:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/18/2015
Retention
PERM
Document Relationships
_CCAgenda 2015 0518 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0518
PowerPoint 10A Action 2015 0518 Bayfair Transit Village
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2015\Packet 2015 0518
Reso 2015-098
(Reference)
Path:
\City Clerk\City Council\Resolutions\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Fourth Phase: CEQA Analysis <br />Deliverables <br />Time Frame <br />main subsections:: <br />o Setting <br />o Impact analysis <br />o Mitigation measures <br />o Level of significance after mitigation <br />The settings will be based on existing data sources to the extent feasible, as well as site <br />visits, noise measurements and other site-specific work. Where possible, impacts will be <br />quantified; otherwise, reasoned and supported assumptions and observations will be used <br />to qualitatively forecast potential project and cumulative impacts. Mitigation measures may <br />include a range of design measures and policies or programs as developed by City staff <br />and the consultant team. All mitigation measures will be presented in wording that can be <br />applied to conditions of approval and will include monitoring requirements. <br />• Alternatives — Up to three alternatives including the "no project" alternative will be <br />examined in the EIR. Evaluation of alternatives will have less detail than for the proposed <br />project, though the analysis will provide decision -makers and the public adequate <br />information to decide between alternatives. This section will also identify the <br />"environmentally superior alternative." <br />• Other CEQA-Required Discussions — The EIR will also include other discussions required <br />by the State CEQA Guidelines, including an analysis of potential growth -inducing impacts <br />and a listing of significant irreversible changes. <br />• Public Review Draft EIR. This task involves the production, editorial work, and <br />communication processes anticipated to publish the Draft EIR for public review and <br />comment. Rincon will be responsible for drafting a Notice of Completion/Notice of <br />Availability and circulating the Draft EIR to the County Clerk and State Clearinghouse. <br />• Final EIR. This task includes preparation of responses to comments on the Draft EIR, a <br />mitigation monitoring and reporting program (MMRP), and publication of the Final EIR. <br />• Findings/Statement of overriding considerations (if needed). Rincon will prepare <br />candidate Facts, Findings, and a Statement of Overriding Considerations that address all <br />facts and findings, project benefits, and, if appropriate, the reason that the project's <br />benefits outweigh its immitigable environmental impacts. <br />• Public Meetings. Rincon will attend and present the draft and final EIR at Planning <br />RAIMI + ASSOCIATES: BAY FAIR BART TRANSIT VILLAGE TOD SPECIFIC PLAN MAY 18, 2015 1 PAGE A-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.